Laserfiche WebLink
<br />E. DUE TO THE CURRENT TEMPORARY CESSATION DF OPERATIONS AT THE McCLANE <br />CANYON MINE, ITEMS A, B AND C LISTED ABDYE ARE MODIFIED AS FOLLOWS: QUARTEPLY <br />FLOW MEASUREMENTS SHALL BE TAKEN ONLY AT SURFACE WATER MONITORING SITE SW-2. <br />WATER QUALITY SAMPLES SHALL BE TAKEN TWICE A YEAR (ONCE DURING SPP,ING SNOWMELT <br />AND ONCE DURING A STOP.M EVENT) AND MUST BE CHEMICALLY ANALY7ED FOR THE <br />PARAMETERS LISTED BELOW: <br />pH <br />Specific Conductance <br />Temperature (field) <br />Bicarbonate (HC03) <br />Calcium (Ca+2) <br />Magnesium (Mg+2) <br />Chloride (CL-) <br />Carbonate <br />Sulfate (504) <br />Iron (Fe) <br />THIS MODIFICATION IS IN EFFECT ONLY FOR <br />IS UNDER A DIVISION APPROVED TEMPORARY <br />ADDITIONAL DISTURBANCES ARE CREATED. <br />STIPULATION N0. 3 <br />SUCH PERIOD OF TIME THAT THE OPFP.ATION <br />CESSATION OF OPERATIONS ACID ND <br />THE APPLICANT MUST SUBMIT TO THE DIVISION AN ANNUAL REPORT CHARACTERIZING THE <br />INFLOWS, DISCHARGES AND THE CONSUMPTION OF WATER WITHIN THE MINE. THIS REPORT <br />IS TO INCLUDE A MINE WORKING MAP SHOWING THE LOCATION AND QUANTITIY OF <br />INFLOWS; A TABLE KEYED TO THE MINE MAP WHICH SHALL CONTAIN THE SOURCE (i.e. <br />FAULT, FRACTURES, ETC.), QUANTITIY, DURATION, AND OUALTIY (i.e. pH, <br />ELECTRO-CONDUCTIVITY AND TEMPERATURE) OF ALL NON-SEEP INFLOWS: A TABLE <br />CONTAINING RECORDS OF WATER DISCHARGED FROM THE MINE, CONSUMED IN THE MINE AND <br />IMPORTED FOR USE WITHIN THE MINE; A DISCUSSION OF THE WATER BALANCE WITHIN THE <br />MINE; AND, A PROJECTION DF HYDROLOGIC IMPACTS OF MINING IN THF. UPCOMING YEAP,. <br />STIPULATION N0: 4 <br />A. THE APPLICANT WILL CONTINUE MONITOPING WELLS GW-1 AND GW-4 IN SALT CP,EEK <br />ALLUVIUM QUARTERLY. AT THESE TIMES THE WATER LFVEL IN THE WELLS WILL BE <br />MEASUP,ED AND SAMPLES WILL BE TAKEN FOR ANALYSIS OF pH, TEMPERATUPE AND <br />SPECIFIC CONDUCTAt•ICE. THE RESULTS OF THIS MONITOPING WILL BE SUBMITTED TO <br />THE DIVISION IMMEDIATELY AFTER DATA COLLECTION AND ANALYSIS. <br />B. THE REQUIREMENTS OF THIS STIPULATION ARE SUSPENDED BY THE DIVISION ONLY <br />FOR SUCH PERIOD OF TIME THAT THE OPERATION IS UNDER A DIVISION APPP,DVED <br />TEMPORARY CESSATION OF OPERATID1dS AND NO ADDITIONAL DISTUPBANCES AP.E CREATED. <br />Stipulation No. 06 <br />TOPSOIL MUST BE ANALYZED FOR FERTILIZER ELEMENTS (N,P,K) PP.IDP. TD SEEDING. <br />IF THE SOIL IS FOUND TO BE PROSPHOROUS DEFICIENT, PHCSPHDROUS MUST BE <br />INCORPORATED INTO THE TOPSOIL DURING THE RESPREADING PROCESS. ANY OTHEP, <br />FERTILIZER ELEMENTS WHICH ARE DEFICIENT IN THE TOPSOIL SHALL BE ADDED <br />AFTER ONE YEARS GROWTH DF VEGETATION AT A TIME OF YEAR APPROVED BY 7NE <br />DIVISION. <br />