Bowie No. 2 Mine (Permit No. C-1996-083) <br />Permit Revision No. 5 <br />Stipulation No. Description <br />9. A DETAn Fn SUBSIDENCE STUDY FOR TERROR CREEK RESERVOIR DAM <br />(BRUCE PARK DAM) WILL BE COMPLETED AND APPROVED PRIOR TO <br />MINING WITHIN ONE MILE OF THE DAM. THE STUDY WILL. ESTABLISH <br />BASELINE CONDITIONS, POTENTIAL MINING-WDUCED SEISMICITY AND <br />POTENTIAL TRANSLATED EFFECTS TO TILE DAM. <br />BY SEPTEMBER 1, 2001, BowtE RESOURCES WILL SUBMIT A TECI-Ba[cAL <br />REVISION TO THE PERMIT ADDRESSING THE INVESTIGATION, DATA <br />COLLECTION, ANALYSES, AND MONITORING PLAN TO ENSURE THE <br />SAFETY AND INTEGRITY OF THE TERROR CREEK RESERVOLR DAM (BRUCE <br />PARK DAM). THE REVISION MATERIALS WLI.L INCLUDE, BUT NOT BE <br />1.lIviITED TO, DATA, A TECHNICAL REPORT, COMPLUINCE SCHEDULES, A <br />SUBSIDENCE CONTROL PLAN, A DETAILED MONITORING PLAN SPECIFIC <br />TO POTENTIAL SEISMICITY AND ANY OTHER POTENTAI. IMPACTS <br />INDUCED BY I,oNGWALL MINING. IN ADDITION, THE SPECIFIC <br />COMPLIANCE DATES AND MEASURES WB.L BE THE FOLLOWING: <br />a 1. JULY 1, 2001 -COMPLETE THE DRILLING PROGRAM, AS REFERENCED W <br />THE COLORADO DMSION OF WATER RESOURCES LETTER TO THE <br />DNISION, DATED FEBRUARY 9, 2001, INCLUDING WSTALLATION OF <br />PIlZOMECERS OR OT[-tER DOWN-HOLE INSTRUMENTATION. <br />2. SEPTEMBER 1, 2001 -SUBMIT THE RESULTS OF T[~ INVESTIGATION <br />AND SEISMIC EVALUATION OF THE STRUCTURE, INCLUDING <br />RECOMMENDATIONS FOR ANY ADDITIONAL WSTRUMENTATION, WITH <br />TILE ABOVE-REFERENCED TECI-INICAL REVISION FOR DIVLSION REVIEW <br />AND APPROVAL, <br />3. NOVEMBER 1, 2001 - WSTALL ANY ADDITIONAL INSTRUMENTATION W <br />ACCORDANCE WITH THE FINAL WSTT2UMENTATION PLAN APPROVED IN <br />THE ABOVE-REFERENCED TECHNICAL REVISION. <br />4. GATHER ALL BASELINE DATA AS REQUIRED IN THE ABOVE- <br />REFsRENCED TECEiT1ICAL REVISION, BEFORE MINING PROCEEDS WITHIN A <br />1 Ma.E RADIUS OF TILE DAM. <br />S. PROVIDE A FINAL REPORT AND IMPACT ANALYSIS, BY A SECOND <br />TECHNICAL REVISION, AT LEAST 9O DAYS PRIOR TO ANT[CtPATED MINING <br />• WITHIN ONE MILE OFTHE DAM. <br />MINING WnTTIN ONE MB..E OF THE TERROR CREEK RESERVOIR (BRUCE <br />PARK DAM) Wu.L NOT BE APPROVED UNTIL ALL NECESSARY <br />