My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL44782
DRMS
>
Back File Migration
>
General Documents
>
GENERAL44782
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:13:28 PM
Creation date
11/23/2007 1:18:00 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
General Documents
Doc Date
12/1/1998
Doc Name
Material Request - Guide
From
Stormwater Permit Folder
Permit Index Doc Type
Reclamation Project
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Metal Mining SWMP Guidance Document <br />Page 3 <br />It is a good idea to start with a portion of the USGS (U.S. Geological Survey) quadrangle map showing the site. <br />These aze available and easily obtainable for the entire state (call USGS, (303) 202-4700); they show a lazge <br />amount of information for very little effort. You can then use the USGS map as a guide for preparing your site <br />map, which will be more detailed. <br />Counties may also have maps suitable as bases to begin mapping procedures. If no other suitable base maps are <br />available, one must be developed. Regardless of the source of the base map, the site map needs to be of <br />suitable scale to show the industrial portion of the facility and the features within it. <br />The map should show, at a minimum: <br />Locations of stormwater outfalls: <br />If the site has a stormwater drainage system, the location of outfalls is a simple task. Indicate on the map <br />where pipeline outfalls are, as well as the general layout of the drainage system such as inlets, grates, <br />pipelines, etc. If stotmwater is conveyed over land without a developed storm drainage system, the points <br />where runoff collects and runs off must be located. <br />Drainage basins for each outfall: <br />Field inspection can usually accomplish this task with acceptable accuracy. Look for high areas such as <br />crests of pazking lots, roads, etc. which would form the division between drainages. Gullies and swales are <br />indicators of stormwater flow direction. Obviously, if runoff is observed during a storm, most uncertainties <br />can be eliminated. <br />Surface water bodies (including dry water courses): <br />Mazk on the site map any surface water bodies, including lakes, streams, springs, wetlands, detention ponds, <br />roadside or irrigation ditches, etc. These do not necessazily need to be within the facility, but may be <br />adjacent to it or impacted by stormwater runoff. <br />Existing structural control measures to reduce stormwater pollution: <br />Show on the map the location of any structural stormwater pollution control measures, such as detention <br />ponds, diversion ditches, covered material storage areas, fuel farm secondary containment structures, etc. <br />4. Stormwater Management Controls <br />Each mining operation certified under by this permit shall develop a description of stormwater <br />quality controls appropriate for that site, and implement such controls. The appropriateness and <br />priorities of controls in the plan shall reflect identified potential sources of pollutants at the mining <br />site. The description of stormwater quality controls shall address the following minimum <br />components, including a schedule for implementing such controls: <br />a. SWMP Administrator -The SWMP shall identify a specific individual or individuals within the <br />mining organization who is responsible for developing the SWMP and assisting the mine <br />operator in its implementation, maintenance, and revision. The activities and responsibilities of <br />the administrator should address all aspects of the facility's SWMP. <br />The SWMP Administrator becomes the contact for all SWMP-related issues and is the person responsible for its <br />accuracy, completeness, and implementation. Therefore, the SWMP Administrator should be a person in an <br />authoritative position. Lazger facilities may want to develop a "SWMP team" in order to shaze the <br />responsibilities and generate greater awazeness and participation. <br />b. Identification of Potential Pollutant Sources and Best Management Practices -The SWMP <br />shall identify potential sources of pollutants at the site, and assess the potential of these <br />sources to contribute pollutants to stormwater discharges associated with mining activities. <br />The SWMP must also describe appropriate Best Management Practices (BMPs) to reduce <br />the potential of these sources to contribute pollutants to stormwater discharges. At a <br />
The URL can be used to link to this page
Your browser does not support the video tag.