Laserfiche WebLink
<br />Dar id Shelton -2- November 18, 1983 <br />In summary, we can approve, under GEC's permit, the disposal of refuse in the <br />East Pit. There would first be a preliminary approval pending final outcome <br />of the bonding issue. Tire approval could be for an extended period of time if <br />GEC manages to post bond. The disposal would be for a limited period of time <br />if GEC fails to post bond and Dorchester does not assume responsibility in <br />their permit docwnent for the pits. If Qorchester wants to leave the pits <br />open for future sites, then they will have to accept the responsibility. <br />Ed is preparing a letter to this effect to send to Dorchester and GEC with the <br />appropriate details. <br />/mt <br />cc: Ed Bischoff <br />Carol Russell <br />Doc. No. 7138 <br />