My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL44739
DRMS
>
Back File Migration
>
General Documents
>
GENERAL44739
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:13:27 PM
Creation date
11/23/2007 1:16:18 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
General Documents
Doc Date
9/1/1994
Doc Name
CRESSON PROJECT PN M-80-244 STATEMENT OF FILE AGREEMENT REACHED ON 8/29/94 REGARDING CONDITION OF SU
From
CRIPPLE CREEK & VICTOR GOLD MINING CO
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />• <br />~~ Cripple Creek & Victor Gold Mining Company <br />' A Joint Venture -Pikes Peak Mining Company, Manager <br />(~ Q 7 Operations OHice Englewood OHlce <br />[`~x~ V P.O. Box 191, 2755 State Highway 67 5251 DTC Parkway, Suite 700, Englewood <br />Victor, Colorado 80860 Colorado 80111 <br />(719) 689-2977 • FAX (719) 689-3254 (303) 889-0700 • FAX (303) 889-0707 <br />August 30, 1994 <br />SENT BY FACSIMILE -HARD COPY FOLLOWS BY MAIL <br />Mr. Berhan Keffelew <br />Environmental Protection Specialist <br />Colorado Department of Natural Resources <br />Division of Mines and Geology <br />Office of Mined Land Reclamation <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />• III IIIIIIIIIIIIIIII <br />999 <br />~1=r,G,~!E~ <br />SEP 011994 <br />,, , : nr~ a r.t.ufllcl5 a i;2~'.o;Y <br />Reference: Cresson Project; Permit Number M-80-244: Statement of File Agreement <br />Reached on August 29. 1994 Re ag rding Condition of Surface of Soil <br />Liner. <br />Dear Mr. Keffelew: <br />This confirms the agreement reached between your Office (the Office of Mined Land <br />Reclamation or "OMLR") and Cripple Creek & Victor Gold Mining Company ("CC&V") <br />regarding the condition of the soil liner surface suitable for overlayment with geosynthetic <br />material. This agreement was reached in the field during your staff's visit on August 29, 1994. <br />This also restates [he pertinent information in Allen Sorenson's August 26, 1994 memorandum <br />to you in a manner satisfactory to both the Office and CC&V. <br />The approved subgrade for the synthetic liner, which subgrade is derived from the Ironclad <br />material, is [o be tested to determine the suitability of minus 2" material (tile approved grain size <br />distribution) in a cylinder test with geomembrane and minus 314 inch material as agreed to on <br />August 29, 1994. Until that test is successfully completed, the compacted surface of the soil <br />liner is to be free of large erratic rocks. The procedure to identity and remove such rocks and <br />to repair the surface was demonstrated and agreed to in the field on August 29, 1994. <br />In addition, and as always required under the approved plan, the soil liner surface will be free <br />of visible wood and other non-earthen debris and shall be free of sharp-objects (including rocks) <br />that protrude in a manner that would, in the view of the quality control and quality assurance <br />inspectors, pose a problem to liner integrity. <br />The inspection hierarchy of the liner surface will be (1) the earth movement contractor, (2) the <br />engineering contractor, (3) the QC inspector, and (4) [he liner installer. Each must be satisfied <br />with the quantitative and qualitative aspects of the soil liner. <br />
The URL can be used to link to this page
Your browser does not support the video tag.