Laserfiche WebLink
<br />PERIODIC SFATEMENT FOR F'AR FIAL PAYMENT NU I <br />Sheet No 1 <br />PROJECT: Hawks Nest Coal Silo Demolition Reclamation <br />FOR THE PERIOD 2/2/94 TO 2'18/94 ,INCLUSIVE <br />OWNER: S[a[e of Colorado, Division of Minerals & Geology <br />CONTRACTOR: Miners Inc. <br />9137 E. Mineral Circle, Suite 160 <br />Englewood, Colorado 80712 <br />STATEMENT OF WORK W'f1RK RF RF(1RMFfl <br />Item Descnption Contract Previous This Estimate Total to Date <br /> Unit S Unit f Unit S Unit E <br />1.0 Mobilization/Demobilization LS. $42,248 04'o SO 709b 529.574 70% $22574 <br />2.0 Structural Demolition & Disposal <br />a. Structural Demolition <br /> Demo Headhouse _ L.S. 519,250 0% SO 100% 519,250 100% 519,250 <br /> Demo Conveyor L.S. $45,000 04'o EO 100°~ 545,000 100% 545.000 <br /> Drill & Blast Silo #1 L.S. 546.550 046 SO 100% 546.550 100% 546,550 <br /> Drill & Blast Silo #2 L.S. $46,550 0% SO 100%'0 $46,550 100% 546.550 <br /> Demo Truck Dump & Scale L.S. $14.S~16 0% 40 0°~0 $0 096 SO <br /> Sub-Total ~ $171,896 SO 5157,350 8157.350' <br />b. Disposal/Borrow Area <br /> Excavate Falling Pit L.S. $27,120 0% $0 65% 517,628 65% 517,628 <br /> Demo & Bury Silos L.S. $38.550 0% 50 09'0 $0 0% SO <br /> Finish Grade Site L.S 54,500 0% SO 046 $0 046 SO <br /> Repart Rnad L.S. $3.500 095 EO 0°-b 50 0% SO <br /> Sub-Total 473.67n ~ _ <br />50 __ 517.628 _ $17.628 <br />3 0 Additmnal Dozer Hours 70 Hrs $4,540 09'o EO 096 $0 0% SO <br />4.0 Denver Rio Grande Flaymen 100 Hrs. 54,500 096 f0 09'0 SO 0% SO <br />Total Work herts '~ 5296,854 f0 5204,552 <br />Material on Hand - SO $0 <br />Change Order SO SO f0 <br />Total 5296,854 f0 5204,552 <br />5204,552 <br />SO <br />80 <br />5204, 5 52 <br /> <br />