Laserfiche WebLink
Stipulation No. 5 <br />FOLLOWING STOCKPILING, TOPSOIL STOCKPILES THAT WILL NOT BE <br />REDISTRIBUTED FOR FIVE OR MORE YEARS SHALL BE SEEDED WITH THE PROPOSED <br />PERMANENT SEED MIX (EXCLUDING SHRUBS) AND NOT THE TEMPORARY SEED MIX. <br />Stipulation No. 6 <br />THE DIVISION DIRECTS WEST ELK COAL COMPANY, PRIOR TO ANY DISTURBANCE AT <br />THE UPPER WASTE PILE SITE, TO SUBMIT AN APPROPRIATE AMENDMENT TO THE <br />OPERATION PLAN WITHIN THE EXISTING PERMIT TO LIMIT EXTRACTION BENEATH <br />THE WASTE PILE AND WITHIN A DEFINED BUFFER ZONE TO PRIMARY DEVELOPMENT <br />ONLY, THE SURFACE BUFFER ZONE WILL BE DEFINED BY THE SUBSIDENCE ANGLE <br />OF DRAW. <br />Stipulation No, 7 <br />THE DIVISION DIRECTS WEST ELK COAL COMPANY, PRIOR TO ANY DISTURBANCE AT <br />THE UPPER WASTE SITE, TO INSTALL SEVERAL ELECTRONIC TILT METER TUBES <br />DOWNSLOPE FROM THE TOE OF THE PROPOSED WASTE STRUCTURE. THESE TILT <br />METER INSTALLATIONS SHALL BE INSTALLED AS SPECIFIED IN WECC'S AUGUST <br />15, 1985 SUBMITTAL. ONE INDICATOR SHALL BE INSTALLED WITHIN 160 FEET <br />OF THE TOE OF THE WASTE PILE CURRENTLY HALF WAY BETWEEN MONUMENTS 51 <br />AND 54, THE SECOND SHALL BE LISTED APPROPRIATELY 100 FEET NORTHEAST OF <br />MONUMENT S2, 160 NORTH OF TOES OF THE WASTE PILE; AS INDICATED ON <br />DRAWING N0. MG-R C-001, INCLUDED IN THE PERMIT REVISION APPLICATION. <br />DURING THE INSTALLATION OF THESE TILT METER TUBES, THE OPERATOR SHALL <br />AUGER AND LOG THE SURFICIAL AND BEDROCK STATIGRAPHY ENCOUNTERED. <br />AUGERING SHALL CONTINUE UNTIL THE OPERATOR HAS ESTABLISHED INTACT <br />BEDROCK OCCURRENCE. IF ANY EVIDENCE OF EXISTING LANDSLIDE DEPOSITS IS <br />ENCOUNTERED, THE OPERATOR SHALL DEFINE THE NATURE AND EXTENT OF THE <br />PRE-EXISTING SLOPE INSTABILITY. IF SUCH LANDSLIDE ACTIVITY IS <br />DISCERNED, THE OPERATOR WILL BE REQUIRED TO APPROPRIATELY RECONFIGURE <br />THE PILE DESIGN, PRIOR TO INITIATION OF ANY CONSTRUCTION ACTIVITY. <br />Stipulation No. 8 <br />SURFACE WATER AND GROUND WATER MONITORING OF THE LOWER PERMANENT <br />UNDERGROUND DEVELOPMENT WASTE PILE WILL INCLUDE THE CHEMICAL <br />CONSTITUENTS SELENIUM, UNIONIZED AMMONIA, AND NITRATE/NITRITE. <br />DETERMINATION OF NITRITE CONCENTRATION WILL BE MADE ONLY WHEN DEEMED <br />NECESSARY BY THE DIVISION. RESULTS AND INTERPRETATIONS ARE TO BE <br />INCLUDED ON A CONTINUING BASIS IN THE WEST ELK COAL COMPANY QUARTERLY <br />HYDROLOGY REPORTS. ANNUAL HYDROLOGY REPORTS ARE TO INCLUDE A SUMMARY <br />OF SEASONAL CHANGES, IF ANY, FOR ALL CHEMICAL CONSTITUENTS (SURFACE <br />WATER AND GROUND WATER) MONITORED DURING THE YEAR: ANNUAL HYDROLOGY <br />REPORTS ARE TO INCLUDE AN ASSESSMENT OF THE IMPACTS OF THE LOWER WASTE <br />PILE TO THE HYDROLOGIC BALANCE DURING THE PREVIOUS YEAR. <br />Stipulation No. 9 <br />ANNUAL HYDROLOGY REPORTS ARE TO INCLUDE, PURSUANT TO RULE 2.04.7(1)(b), <br />A MAP SHOWING THE PIEZOMETRIC SURFACE OF THE COLLUVIAL AQUIFER IN THE <br />AREA OF THE LOWER PERMANENT UNDERGROUND DEVELOPMENT WASTE PILE, IF ONE <br />DEVELOPS. <br />