Laserfiche WebLink
UG-.~ 1 -9 g TUE 9 22 RN <br />Return by August 31, 1999 at 3:30 p.m. to: <br />Yvonne Brannon <br />1313 Sherman St., #215 <br />Denver, CO 80203 <br />Fax (303) 832-8106 <br />R O B I N S O N ~ S O N <br />Grassy Gap Coat Mine Maintenance Project <br />PfKA-0-1074 <br />Bid Schedule <br /> <br />III II II IIII IIIII I II 2 <br />999 <br />t. <br /> UNIT <br />ITEM # DESCRIPTION AMT UNIT COST TOTAL <br />1 Low Water Crossings, Per <br />Specifications <br />2 Each $ i 45. <br />~_ <br />$490.00 <br />2, Rolled Dip ,Per Specification 1 Each $ 990.00 $ 990.00 <br />3 Sediment Pond Dewatering <br /> Device Repair, Per <br />1 <br /> S ecifications Job NJA $ a,np ~ <br />q. Seal Sediment Pond, Per 1 Job N/A $ e4~, fin <br /> S ecifications <br />5' Equipment Rental ~ <br />r <br /> s ,~~ <br />A' Backhoe/Loader 10 Hours $ss,oo $ 650.00 <br />B. EndOumpTruck 6 Hours $65-00 $ ~~-~ 1 <br />C. Rip Rap Materials 20 Cubic Yards $i~.sn $ s_so.oo <br /> GRAND TOTAL $_, <br />Contractor°. R NS b S Date AUG[JST 30, 1999 <br />Signature Phone (970)276-3268 <br />Address g.0. BOX 117 _ <br />D <br />HAYDEN, COIARADO 81639 ~~ biz <br />z3 !,~'' <br />Tax ID # 84-0771248 ,~q <br />5 <br />THIS BID SCHEDULE MUST BE RETURNED WfTH YOUR B1D <br />Page 1 of 1 Page <br />;~ <br />