My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL44630
DRMS
>
Back File Migration
>
General Documents
>
GENERAL44630
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:13:20 PM
Creation date
11/23/2007 1:11:03 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982055
IBM Index Class Name
General Documents
Doc Date
9/1/1998
Doc Name
Proposed Decision & Findings of Compliance for RN3
Permit Index Doc Type
FINDINGS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />The permit application is accurate and complete. All requirements of the Act and these <br />rules have been complied with (2.07.6(2)(a)). <br />Based on information contained in the permit application and other information available <br />to the Division, the Division finds that reclamation can be feasibly accomplished at the <br />Raton Creek Mine (2.07.6(2)(6)). <br />3. The assessment of the probable cumulative impacts of all anticipated coal mining in the <br />general azea on the hydrologic balance, as described in 2.05.6(3), has been made by the <br />Division. This assessment entitled "Cumulative Hydrologic Impact Assessment, <br />Purgatoire River Basin" is available for inspection at the offices of the Division. The <br />Division finds that the operations proposed under the application have been designed to <br />prevent damage to the hydrologic balance outside the proposed permit azea (2.07.6(2)(c)). <br />4. The Division finds that the permit azea is, subject to valid rights existing as of August 3, <br />1977, not within: <br />a) An area designated unsuitable for surface coal mining operations (2.07.6(2)(d)(I)); <br />b) An azea under study for designation as unsuitable for surface coal mining <br />operations (2.07.6(2)(d)(ii)); <br />c) The boundaries of the National Park System, the National .Wildlife Refuge <br />System, the National System of Trails, the National Wilderness Preservation <br />System, the Wild and Scenic Rivers System including rivers under study for <br />designation, and National Recreation Areas (2.07.6(2)(d)(iii)(A)); <br />d) Three hundred feet of any public building, school, church, community or <br />institutional building, or public pazk (2.07.6(2)(d)(iii)(B)); <br />e) One hundred feet of a cemetery (2.07.6(2)(d)(iii)(C)); <br />f) The boundaries of any National Forest unless the required fmding of compatibility <br />has been made by the Secretary of the U.S. Department of Agriculture <br />(2.07.6(2)(d)(i ii)(D)); <br />g) One hundred feet of the outside right-of--way line of any public road except where <br />mine access or haul roads join such line, and excepting any roads for which the <br />necessary approvals have been received, notices published, public hearing <br />opporhrnities provided, and written findings made (2.07.6(2)(d)(iv)); <br />h) Three hundred feet of an occupied dwelling unless a written waiver from the <br />owner has been provided (2.07.6(2)(d)(v)). <br />
The URL can be used to link to this page
Your browser does not support the video tag.