My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL44562
DRMS
>
Back File Migration
>
General Documents
>
GENERAL44562
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:13:18 PM
Creation date
11/23/2007 1:08:39 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981028
IBM Index Class Name
General Documents
Doc Date
11/15/1982
Doc Name
STIPULATION 14 TO KEENESBURG MINE PN C-028-81
From
MLR
To
COORS ENERGY CO
Permit Index Doc Type
STIPULATIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~' <br />~II ~I~III~I~~II~ ~I~ <br />STVTE OF COLOR4DO F4''+nnnn L-~m :'. '~•~:~•:~nr.~ 999 <br />DEPARTMENT OF NATURAL RESOURCES <br />D. Monte Pascoe, Executive Director <br />MINED LAND RECLAMATION <br />423 Centennial Building, 1313 Sherman Street <br />Denver, Colorado 80203 Tel. (303) 866-3567 <br />David C. Shelton <br />Director <br />November 15, 1982 <br />Mr. John Nelson <br />Coors Energy Company <br />P.O. Box 359 <br />Keenesburg, Colorado 80643 <br />RE: Stipulation No. 14 to Keenesburg Mine <br />Permit No. C-028-81 <br />Dear Mr. Nelson: <br />The Division received your response to stipulation number 14 in a <br />letter dated October 14, 1982.from Bill Robie. The stipulation referred <br />to reads as follows: <br />Coors Energy Company shall construct all additional powerlines and <br />poles at the Keenesburg mine site so as to minimize the danger of <br />electrocution to raptors. The designs shall be submitted to and be <br />approved by the Division before construction. <br />Based on the information supplied by Mr. Robie the Division finds that <br />the two types of powerlines utilized at the mine are in compliance with <br />raptor protection requirements and may be relocated as desired. Any <br />new powerlines constructed with the same design will also be in compliance. <br />If however, a different design is chosen Coors should obtain approval <br />for its use prior to installation. <br />Thank you and Mr. Robie for your attention to this matter, <br />Sincerely, ,~ <br />_i=' - <br />~~~~~~ <br />Robert Liddle <br />Reclamation Specialist <br />RL/ep <br />cc: Bill Robie <br />Adolph Coors Company <br />
The URL can be used to link to this page
Your browser does not support the video tag.