Laserfiche WebLink
<br />RECLAMATION COST SUMMARY cont'd sheet 4 of 4 <br />K. PORTAL/SHAFT SEALING <br />Task No.~ Task Description ~ Cost (f) <br />________I_____________________________~__________________I____________ <br />Included in Cost of Equipment Rental ~ SO <br />Subtotal (K): <br />L. DRILL MOLE/MONITORING NELL SEALING <br />Task No.l Task Description ~ Cost (f) <br />Subtotal (L): <br />N. NISCE LLANEOl1S RECLAMATION TASKS <br />Task No.~ Task Description ~ Cost (f) <br />________I_____________________________~_~~______________I____.._...__ <br />Rental and Operating Cost of Equi Anent ~ E2, 190 <br />Demolition <br />2 ~ Seeding ~ 5424 <br />Fencing <br />1 ~ Mob/Demob ~ 5729 <br />Subtotal (M ): 53,343 <br />TOTAL DIRECT RECLAMATION LOSTS (subtotals A through M): f3,343 <br />I1. INDIRECT COSTS <br />________________________________________________________________________ <br />________________________________________________________________________ <br />A. CONTRACTOR'S OVERHEAD 8 PROFIT <br />Item No.~ Item Description ~ Cost (S) <br />________I__________________________________________________I---_________ <br />1. ~ Public Liability Insurance.... 1.550% of dir. ~ S52 <br />2. ~ Contractor's Performance eord 0.975% of dir. ~ f33 <br />3. ~ Contractor's Profit........... 10.00% of dir. ~ f334 <br />4. ~ Job Superintendent.. <br />Subtotal (A ): 5419 <br />____________ <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (direct plus 0 8 P): f3, 762 <br />B. DNG PROJECT ADMINISTRATION EXPENSES <br />Item No.~ Item Description ~ Cost (S) <br />1. ~ Minerals Program Admin. Fee at 5.00% of cntr.~ f188 <br />NET INDIRECT COST PERCENTAGE: 18.15% Subtotal (B): 5188 <br />TOTAL INDIRECT RECLAMATION COSTS (subtotals A through B): 5607 <br />TOTAL PERFORMANCE BOND AMOUNT (direct plus indirect costs): 53,950 <br />