My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL44547
DRMS
>
Back File Migration
>
General Documents
>
GENERAL44547
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:13:18 PM
Creation date
11/23/2007 1:08:21 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
General Documents
Doc Date
5/18/1983
Doc Name
MINING PERMIT (Dated 5/18/83 to 5/18/88)
Permit Index Doc Type
PERMIT LEGAL DOCUMENT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Stipulation No. 1 <br /> <br />TU VERIFY THE APPLICANT'S PREDICTIONS OF STREAM UEPLETIOIVS IN THE <br />AREA OF THE WADGE CURL-OVERBURDEN AQUIFER DISCHARGE AREA ON FISH <br />CREEK, THE APPLICANT SHALL INSTALL AND MONITOR A SET OF NESTED <br />PIEZOMETERS COMPLETED IN THE ALLUVIUM OF FISH CREEK OVERLYING THE <br />SUBCRUP OF THE WADGE COAL-OVERBURDEN AQUIFER. A PLAN SHALL BE <br />SUBMITTED WITHIN 30 DAYS AND THE WELLS SHALL BE INSTALLED WITHIN <br />120 DAYS OF ISSUANCE OF THIS PERMIT. THE WELLS SHALL BE MONITORED <br />MONTHLY FOR WATER LEVELS AND THE RESULTS OF MONITORING SUBMITTED <br />QUARTERLY TO THE DIVISION. <br />Stipulation No. 2 <br />WITHIN 30 DAYS OF 7HE PERrdIT ISSUANCE, THE APPLICANT SHALL SUBh1IT <br />TO THE DIVISION FOR REVIEW A PLNN TO DISCONTINUE THE DISCHARGE OF <br />ANY WATER FROM THE SPOILS AQUIFER TO THE SURFACE WATER/ALLUVIAL <br />AQUIFER SYSTEM. THE PLAN SHALL BE PUT INTO EFFECT WITHIN 45 DAYS <br />OF APPROVAL BY THE DIVISION. <br />Stipulation No. 3 <br />THE APPLICANT SHALL INL'LUDE, AS PART OF THE QUARTERLY HYDROLOGIC <br />rvIUNITORING SUBMITTAL, THE RESULTS OF ALL HYDROLOGIC MONITORING <br />REQUIRED BY THE COLORADO DEPARTMENT OF HEALTH. <br />Stipulation No. 4 <br />WITHIN 60 DAYS OF PERt4IT APPROVAL, THE APPLICANT SHALL SUBMIT A <br />PLAN FOR MONITORING THE DISCHARGE OF WATER FROhI THE UNDERGROUND <br />WORKINGS. THE MONITORING PLAN SHALL INCLUDE CONTINUOUS FLOW <br />MONITORING, MONTHLY SAMPLING OF FIELD PARNMETERS, AND QUARTERLY <br />SAMPLING OF FULL SUITE WATER QUALITY. THE APPROVED MONITORING PLAN <br />SHALL GO INTO EFFECT AS SOON AS WATER IS DISCHARGED FROM 7HE <br />UNDERGROUND WORKINGS, AND THE MONITORING RESULTS SHALL BE INCLUDED <br />IN THE OPERATOR'S QUARTERLY HYDROLOGIC REPORTS. <br />Stipulation No. 5 <br />THE APPLICANT SHALL SUBh1IT AN ANNUAL HYDROLOGIC MONITORING REPORT <br />FOR THE FUIDEL CREEK MINE. THE MONITORING REPORT SHALL INCLUDE A <br />SUMMARY AND ANALYSIS OF DATA COLLECTED DURING THE YEAR, INCLUDING: <br />1) WATER USED IN THE MINING OPERATION, 2) MINE WATER DISCHARGES TO <br />RECEIVING STREAMS (QUANTITY AND QUALITY), 3) MINE WATER INFLOWS <br />(ANNUAL MINE INFLOW STUDY), 4) STREAM FLOIJS AND QUALITY, 5) IMPACTS <br />TO THE QUALITY AND QUANTITY OF ALLUVIAL AND BEDROCK AQUIFERS, AND <br />6) IMPACTS TU SPRING FLOWS AND QUALITY. THE MONITORING REPORT <br />SHOULD INCLUDE A DESCRIPTION OF MITIGATIVE MEASURES TAKEN TO <br />MINIMIZE DISTURBANCE TO THE PREVAILING HYDROLOGIC BALANCE. THE <br />MONITORING REPORT SHALL BE ADEQUATE TO PLAN FOR MODIFICATION OF <br />SURFACE OR UNDERGROUND MINING ACTIVITIES, IF NECESSARY, TU MINIMIZE <br />DISTURBANCE TO THE PREVAILING HYDROLOGIC BALANCE. <br />
The URL can be used to link to this page
Your browser does not support the video tag.