Laserfiche WebLink
•~, <br />-a- <br />YII. Stipulation Status - the following section describes remaining issues <br />w is need to a addressed to satisfy outstanding stipulations. All <br />data and commitments represented by the 31 permit stipulations, 13 <br />permit revision stipulations, and 2 technical revision stipulations, <br />should be incorporated into the permit as revised pages. <br />Stipulation 2 - STREAM BUFFER ZONE SIGNS HAVE BEEN ERECTED IN THE HIGH <br />TRAFFIC AREAS ON SITE. SIGNS NEED TO BE PLACED ALONG <br />THE ENTIRE LENGTH OF THE PURGATOIRE RIVER WITHIN THE <br />PERMIT BOUNDARY TO SATISFY THIS STIPULATION. <br />Stipulation 3 - ALTHOUGH THERE HAS BEEN SOME DISCUSSION PURSUANT TO <br />THIS STIPULATION, THE DIVISION IS SATISFIED THAT THE <br />RECENT CERTIFICATION, ALONG WITH WFC'S COMMITMENT TO <br />SURVEY THE SEDIMENT ACCUMULATION ANNUALLY, MEETS THE <br />REQUIREMENTS OF THIS STIPULATION. WFC IS AWARE THAT <br />ANY CHANGES IN POND CONSTRUCTION MUST BE FOLLOWED BY <br />AS-BUILT CERTIFICATIONS. PRESENTLY, CERTIFICATION FOR <br />BACKFILLING THE POND 006 EMERGENCY SPILLWAY IS REQUIRED. <br />Stipulation 4 - WFC NEEDS TO PROVIDE THE EVIDENCE REQUIRED BY THIS <br />STIPULATION AND AS DISCUSSED IN OUR TELEPHONE <br />CONVERSATIONS, TO INDICATE THAT DRAINAGE FROM THE WEST <br />PORTAL AREA DOES NOT NEED TO BE ROUTED TO A SEDIMENT <br />POND. THE STIPULATION CAN BE SATISFIED BY SHOWING THAT <br />RUNOFF FROM A 10 YEAR 24 HOUR EVENT WILL EITHER BE <br />CONTAINED IN THE WEST PORTAL AREA, OR WILL MEET <br />EFFLUENT STANDARDS BASED ON CALCULATIONS OF SEDIMENT <br />LOAD. <br />Stipulation 14 - WFC NEEDS TO ADDRESS IMPACTS ON STOCK PONDS AND WIND <br />MILLS IN CI.RUELA AND APACHE CANYONS AS DESCRIBED IN A <br />MEMO FROM CANDY~THOMPSON DATED NOVEMBER 27, 1986. <br />Stipulation 16 - THE SLIGHT LANGUAGE CHANGES DESCRIBED IN THE DIVISION'S <br />LETTER OF JANUARY 17, 1986, AND REFUSE SAMPLING TO A <br />DEPTH OF 40" IS REQUIRED TO SATISFY THIS STIPULATION. <br />Stipulation 19 - AS WITH STIPULATION 16, REFUSE MUST BE SAMPLED TO A <br />DEPTH OF 40 INCHES TO SATISFY THIS STIPULATION. THE <br />TOPSOIL PLAN NEEDS TO BE AMENDED AS STATED IN THE <br />DIVISION'S LETTER OF JANUARY 17, 1986. WFC MAY WISH TO <br />CONSIDER THE LAYDOWN AREA EAST OF THE NON-COAL WASTE <br />DISPOSAL AREA AS AN ADDITIONAL SOURCE OF TOPSOIL. WFC <br />MUST PROVIDE JUSTIFICATION FOR THE PROPOSED SEED MIX <br />CHANGES. IN ADDITION, THE RECOMMENDATIONS OF THE CSU <br />STUDY SHOULD BE INCORPORATED INTO THE REYEGETATION <br />PLAN. ALL AREAS SHOULD BE RIPPED TO A DEPTH OF 18 <br />INCHES PRIOR TO SEEDING. <br />