Laserfiche WebLink
<br />STATUS OF STIPULATIONS AND REVISIONS TO THE PERMIT <br />Permit Revisions since the Midterm Review (April 1 997) <br />Revision Number Description Date <br />none ----------- ---------- <br />Technical Revisions since the Midterm Review (April 1997) <br />Revision Number Description Date <br />TR-41 Midterm review responses September 1998 <br />TR-42 Ownership & Control August 1998 <br />Minor Revisions since the Midterm Review (April 19971 <br />Revision Number Description Date <br />MR-78 Eliminate River Survey April 1998 <br />MR-79 Transfer Apache Shafts August 1998 <br />MR-80 RDA Ditch Stabilization September 1998 <br />Bond Releases since the Midterm Review (April 1997) <br />Revision Number Description Date <br />SL-01 Liability release over the October <br /> underground workings south of 1998 <br /> Highway 12 <br />The stipulation history for this site is difficult to follow due to the re-use of stipulation <br />numbers throughout the life of this site. Stipulations are a binding part of the permit and <br />previously assigned stipulation numbers are not to be re-used. Investigation of the <br />stipulation response file, revisions to the permit, and the findings document indicate the <br />following stipulations are still active, as shown below. After review of various files and <br />documents maintained for this permit, all stipulations have been satisfied except as <br />specifically identified below. <br />The active Stipulations to the permit immediately prior to this Permit Renewal (RN-031, <br />which originated from previous permitting actions, are as follows: <br />2 <br />