Laserfiche WebLink
<br />Hawk's Nest Coal silo Facility Reclamation Project <br />RN-COAL-MINES-9 <br />Work Narrative <br />The Hawk's Nest Coal Silo Facility Reclamation Project comprises <br />the South 1/2 of Section 10, Township 135, Range 90W along old <br />State Highway 133. The Hawk's Nest Mine site has been ordered to <br />be reclaimed by the Colorado Department of Natural Resources, Mined <br />Land Reclamation Board (the Board). Reclamation work to be <br />accomplished under this contract is limited primarily to the Coal <br />Silo area. Project work will involve demolishing and removing the <br />(2) two coal silos and the adjacent conveyor system and truck dump <br />scale, creating a borrow area for the demolished silos, and burying <br />the demolished material. <br />The CONTRACTOR shall utilize controlled blasting techniques for the <br />two (2) coal silos. Controlled blasting refers to the controlled <br />use of explosives and blasting accessories in carefully spaced and <br />aligned drill patterns. Any cost resulting from damage to adjacent <br />roadways, transmission lines, railroad facilities, nearby <br />structures, or vegetation will be the responsibility of the <br />CONTRACTOR. <br />The contractor will conduct a pre-blast survey of all structures <br />and facilities located in the area of the blasting work. Such <br />structures and facilities include, but are not limited to the <br />Hawk's Nest Guest House, DMEA Substation, railroad tracks, utility <br />lines and existing roads. The CONTRACTOR must submit to the State, <br />Mountain Coal Company and the Rio Grande Railroad prior to the <br />initial blast methods of stabilizing or protecting adjacent <br />structures, such as the railroad tracks within two weeks prior to <br />beginning any work. The CONTRACTOR will be responsible for <br />submitting a blast design to the State, Mountain Coal Company and <br />the Rio Grande Railroad of the initial blast not later than 7 days <br />prior to beginning drilling. <br />All portions of each structure removed by the CONTRACTOR but not <br />taken as salvage shall be disposed of within the Coal Storage <br />working limits areas or hauled to the county landfill. On-site <br />disposal shall consist of burying demolished material in the old <br />sediment pond or creating a borrow area within the coal silo <br />facility area. <br />m:\coal\esc\hawk\worknar <br />