My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL44420
DRMS
>
Back File Migration
>
General Documents
>
GENERAL44420
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:13:14 PM
Creation date
11/23/2007 1:00:42 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1976032
IBM Index Class Name
General Documents
Doc Date
1/16/1998
Doc Name
MEMO TELLURIDE GRAVEL EXPANSION OF MINING & MINERAL PROCESSING OPERATION
From
SAN MIGUEL CNTY PLANNING DEPT
To
DAVE SCHNECK STEVE SWICK MIKE HORNER DMG & USFS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EL~LURIDE <br />L_~ RAVEL, <br />1 NC. <br />P.O. Box 445, Telluride, CO 81435 <br />(970) 728-3775 • Fax (970) 728-3015 <br />December 29, 1997 <br />RE: Expansion of Use Exhibit for Article 4-206 - Standazds Report <br />The addition of a Tire Shop, Welding Shop and Crew Trailer complies with the applicable <br />substantive review standards. Our operation has been recognized by the County as apre-existing, <br />non-conforming use which includes maintenance of equipment. The Welding Shop is necessary in <br />order to repair and maintain equipment and the Tire Shop is necessary in order to fix the tires on <br />our equipment. The Pit Trailer is simply used as a place for the drivers to meet and stay out of <br />the weather. None of these buildings aze necessary except to be used as places to perform work <br />included in our recognized uses. There is just not enough room to perform all of the welding and <br />all of the tire repair in the one Mechanic's Shop which is permitted. <br />Since we pre-date San Miguel County zoning, our zoning is exactly our operation. These <br />buildings fit exactly with the zoning - in fact, they help define it. Also, the buildings only are <br />used for passive operations, so there is no impact to the surrounding area due to these buildings. <br />Traffic and other impacts relate to the rest of our operation and are not addressed here. All of the <br />uses for which these buildings ared requird take place inside the buildings themselves. Therefore, <br />we are in compliance with the County Master Plan, Land Use Policy and Zone District and <br />Neighborhood. Also, since the buildings are already up and have been for years, it is easy to <br />observe that they are consistent and compatible with the rest of the operation. The traffic patterns <br />to these buildings have been well established and are appropriate <br />
The URL can be used to link to this page
Your browser does not support the video tag.