Laserfiche WebLink
<br />AMI. is planning to bid out a reclamation project which would use remaining bond monies, with project <br />scheduled for late this fall. The reclamation concept would include drainage conswction/stabiliTation on <br />the Mine 1 bench and outslope, replacement of buried road culvert wish an open channel, and construction <br />of a riprapped emergency spillway on the pond embanlanent <br />I have been inspecting the site at least quarterly since the 1997 flood, and conditions have not changed <br />appreciably. <br />