My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL44406
DRMS
>
Back File Migration
>
General Documents
>
GENERAL44406
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:13:12 PM
Creation date
11/23/2007 1:00:00 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984063
IBM Index Class Name
General Documents
Permit Index Doc Type
STIPULATIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iitiiuiu~iuiui~i <br /> <br />-3- <br />2. PUMPAGE RATES FROM THE MINE TO THE SEDIMENT PONDS WILL BE RECORDED <br />WITH THE MINE WATER TESTED QUARTERLY FOR FIELD PARAMETERS AND ONCE <br />YEARLY FOR THE FULL SUITE OF CHEMICAL PARAMETERS. <br />3. THE MINE WELLS 0.5 AND 1.5 COMPLETED IN THE COAL SEAMS OVERLYING <br />THE E SEAM WILL BE SAMPLED ON A QUARTERLY BASIS FOR WATER LEVEL AND <br />FIELD PARAMETERS. <br />4. A WELL WILL BE PLACED AT THE PROJECTED BASE OF THE REFUSE PILE AND <br />COMPLETED IN THE ALLUVIUM. THIS WELL MUST BE COMPLETED PRIOR TO <br />DISTURBANCE AT THE REFUSE WASTE SITE. COMPLETION DIAGRAMS SHOULD BE <br />SUBMITTED TO THE DIVISION WITHIN 30 DAYS OF COMPLETION. THIS WELL WILL <br />BE SAMPLED MONTHLY FOR WATER LEVEL AND FIELD PARAMETERS ANO QUARTERLY <br />FOR FULL SUITE CHEMICAL PARAMETERS. <br />FIELD PARAMETERS <br />FULL SUITE CHEMICAL PARAMETER <br />TEMPERATURE pH MAGNESIUM <br />pH TEMPERATURE SULFATE <br />CONDUCTIVITY SPECIFIC CONDUCTANCE FLUORIDE <br />FLOW OR WATER LEVEL DISSOLVED SOLIDS BORON <br />SODIUM ALKALINITY <br />POTASSIUM BICARBONATE <br />CALCIUM <br />STIPULATION NO. 2 <br />THE PERMITTEE WILL SUBMIT TO THE DIVISION A DESIGN TO PROVIDE FOR <br />NON-CLOGGING FREE OPERATION OF THE ORIFICE iN POND SP-2 WITHIN 30 GAYS <br />OF PERMIT ISSUANCE. <br />STIPULATION N0. 3 <br />THE PERMITTEE WILL PRESENT TO THE DIVISION A PLAN WHEREBY THE 60 <br />PERCENT SEDIMENT VOLUME LEVEL CAN BE MARKED ON PONDS SP-1 ANO SP-2. <br />THIS PLAN SHOULD BE SUBMITTED WITHIN 60 DAYS OF PERMIT ISSUANCE. THE <br />PONDS WILL BE MAINTAINED WITH SEDIMENT LEVEL AT OR BELOW THIS LEVEL. <br />THE MITTEE MUST IDENTIFY THE AMOUNT OF WATER LOST THROUGH THE SYSTEM <br />AND IDENTIFY, AT A MINIMUM, ALTERNATIVE SOURCES OF WATER FOR <br />AUGMENTATION. THE INFORMATION SHOULD BE SUPPLIED TO THE DIVISION <br />WITHIN 60 DAYS OF PERMIT ISSUANCE. <br />~~ <br />STIPULATIUN N0. 4 ' <br />STIPULATION N0. 5 <br />BASED ON VEGETATION LOVER DATA INCLUDED IN THE APPLICATION, THE <br />REVEGETATION SUCCESS STANDARD FOR THE EA STSIDE MINE IS SET AT 35%. THE <br />VEGETATION DOVER STANDARD OF 20% AS PROPOSED AND DISCUSSED ON PAGES 118 <br />AND i18A OF THE APPLICATION SHALL BE REVISED 'WITHIN ONE MONTH OF PERMIT <br />ISSUANCE. <br />
The URL can be used to link to this page
Your browser does not support the video tag.