My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL44365
DRMS
>
Back File Migration
>
General Documents
>
GENERAL44365
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:13:08 PM
Creation date
11/23/2007 12:59:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980001
IBM Index Class Name
General Documents
Doc Date
11/2/1994
Doc Name
EDNA MINE C-80-001 WEST RIDGE HYDROLOGIC PLAN PROGRESS REPORT
From
DMG
To
PITTSBURG & MIDWAY COAL MINING CO
Permit Index Doc Type
RECLAMATION PROJECTS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iii iiiiiiiuiiii iii ~- <br />999 <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Depanmenl of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: 1303) 866-3567 <br />FAX: (303)832-8106 <br />November 2, 1994 <br />David L. Beverlin <br />Edna Mine <br />The Pittsburg & Midway Coal Mining Company <br />P.O. Box 176 <br />Oak Creek, Colorado 80467 <br />RE: Edna Mine (C-80-001) <br />West Ridge Hydrologic Plan Progress Report <br />Dear Mr. Beverlin: <br />I~~~~ <br />DEPARTMENT OF <br />NATURAL <br />RESOURCE <br />Roy Romer <br />Governor <br />lames 5. Lxhhead <br />Executive Drrector <br />Michael B. Long <br />Division Director <br />The Division has received a copy of the above mentioned report. Submittal of the report <br />satisfies, for 1994, the annual submittal required by Stipulation 31 to the Edna Mine pertmt. <br />The report indicated that check dam construction, and the pond inlet armoring in lieu of dams <br />22 and 23 are now complete. Observations of the dams and pond inlet by Division personnel <br />indicate the dams appear to have been properly constructed, demonstrating excellent <br />workmanship. <br />The construction schedule presented in Appendix 4.6-M predicted check dam completion during <br />the 1993 season, with approximately seven terraces completed in the 1994 constructlon season. <br />The 1994 report notes that accelerated grading of the pit area impeded terrace construction due <br />to manpower and equipment availability. P&M notes, however, that completion of the project <br />in 1995 remains viable. The Division agrees that with a concentrated effort, completion ]n 1995 <br />remains possible. Please be aware that in order to delay completion of the project, climatic <br />conditions or other circumstances beyond P&M's control would have had to occur. It is the <br />Division's position that to date, these conditions have not occurred, and a delay in the schedule <br />would not be warranted at this time. <br />Should you have any questions or need additional information, please contact me. <br />Sincerely, <br />1tG~[.2h <br />Susan L Bu <br />Environmental Protection Specialist <br />SLB\110294B.WP <br />
The URL can be used to link to this page
Your browser does not support the video tag.