My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL44268
DRMS
>
Back File Migration
>
General Documents
>
GENERAL44268
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:13:03 PM
Creation date
11/23/2007 12:56:45 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
General Documents
Doc Date
4/21/1983
Doc Name
MINING PERMIT (Dated 4/20/83 to 4/20/88)
Permit Index Doc Type
PERMIT LEGAL DOCUMENT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Attachment B <br />Page 2 <br />Stipulation No. 6 <br />COLORADO WESThiORELAtJD INC. IS DIRECTED TO CUMPLEiE, AS PART OF A <br />TECHNICAL REVISION, PHASE III OF THE STABILITY ANALYSIS AND <br />REDESIGN OF THE FINAL RECLAIMED CONFIGURATION OF THE SURFACE <br />FACILITY AREA OF THE ORCHARD VALLEY MINE, AS DESCRIBED IIJ THE <br />LETTER OF PROPOSAL FROM GEO-HYDRO CONSULTANTS, INC., INCLUDED <br />WITHIN VOLU1+iE 10 OF THE ORIGINAL APPROVED PERMIT APPLICATION. THE <br />SCOPE OF PHASE III SHALL INCLUDE THE UTILIZATIOfJ OF THE FINDINGS <br />AND RECOMMENDATIONS OF PHASE II TO COMPLETE SPECIFIC ENGINEERING <br />REDESIGN ANU AMENDMENT OF 7HE FINAL RECLAIMED CONFIGURATION OF 7HE <br />SURFACE FACILITY AREA OF THE ORCHARD VALLEY f4INE. THIS PROJECT <br />SHALL PROCEED IN A TIhiELY FASHION TO COMPLETIOIJ BY UCTUdER 15, <br />1983. THE DIVISION SHALL BE KEPT INFORMED dY QUARTERLY LETTER OF <br />THE PROGkESS OF THIS TASK, BY THE OPERATOR. UPON COMPLETION OF <br />PHASE III, THE RECLAMATION PLAN SHALL BE APPROPRIATELY AMENDED. <br />Stipulation No. 7 <br />COLORADO WESTMORELAND INC. IS DIRECTED TO FINALIZE THE DESIGN <br />(INCLUDING UKAINAGE DESIGNS) OF THE PROPOSED LUNG-TERM COAL <br />PROCESSING WASTE DISPOSAL STRUCTURE HT THE ORCHARD VALLEY MINE. <br />THIS DESIGN IS TU BE SUBMITTED AS A TECHNICAL REVISION PRIOR TU <br />JULY 31, 1983. PRIOR TO APPROPRIATE REVISION OF THE MINE PLAN, THE <br />OPERATOR SHALL CONTINUE PLACEMENT OF COAL PROCESSING WASTE AT THE <br />EXISTING WASTE PILE LOCATION. THE TOTAL AMOUNT OF CONL PROCESSING <br />WASTE PLACED IN THE EXISTIiG STRUCTURE SHALL NOT EXCEED 25,000 <br />CUBIC YARDS. FURTHERI+IORE, IN ADDITION TO THE INSPECTION AND <br />REPORTING REQUIREMENTS OF RULE 4.10.2, COLORADO WESTMORELAND INC. <br />SHALL SUBMIT RECORDS Uk CALCULATIUNSS TO VERIFY THE TOTAL <br />ACCUMULATED QUNNTITY OF COAL PROCESSING WASTE DISPOSED OF AT THE <br />EXISTING SITE AS A PORTION OF ITS QUARTERLY INSPECTION REPORT TO BE <br />SUUMITTEU TU THE DIVISION. <br />Stipulation No. 8 <br />WITHIN 90 DAYS AFTER THE COMPLETION OF PHASE III OF THE STABILITY <br />ANALYSIS AND REDESIGN OF THE FINAL RECLAIMED CONFIGURATION OF THE <br />SURFACE FACILITY /UtEA OF THE ORCHARD VALLEY MINE, THE APPLICANT <br />I+IUST SUBMIT TU THE DIVISION A REVISED BACKFILLING AND GRADING COST <br />ESTIMATED FUR THE SURFACE FACILITY AREA. IF THIS REVISED COST <br />FIGURE IS GREATER THAN THE PRESENT ESTIMATE, THE AMOUNT OF THE <br />RECLAMATION BOND WILL BE INCREASED ACCORDINGLY. <br />End of Stipulations, <br />
The URL can be used to link to this page
Your browser does not support the video tag.