My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL44142
DRMS
>
Back File Migration
>
General Documents
>
GENERAL44142
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:12:58 PM
Creation date
11/23/2007 12:52:03 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981037
IBM Index Class Name
General Documents
Doc Date
3/23/1995
From
COLO WEST LEASING
To
CAPITOL COMPLEX FACILITIES
Permit Index Doc Type
GENERAL CORRESPONDENCE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C~ WEST LEASING <br />FOOT NOTSS <br />~~ General conditions page 1. Special conditions have <br />precedence over general bid specifications. Special <br />conditions task 1 MOB and DBMOB refers yoU to section 1 of <br />standard work specifications. <br />1.3 measure and payment <br />No measurement for payment shall be made for mobilization <br />and demobilization. Payment of two-thirds of the lump sum <br />price bid will be made with the first monthly progress <br />payment after completion of the work described above for <br />mobilization. Payment of one-third of the lump-sum price <br />bid will be made with the final progress payment for the <br />work if demobilization has been completed. If the price bid <br />for mobilization and demobilization is greater than 15 <br />percent (158) pf the total contact price, invoices <br />supporting the mobilization costs will be required before <br />payment is approved. <br />Thelstate should not hold retainage on MOB Under the terms <br />of this agreement. I should have been paid according to the <br />contract language, 2/3 :of the bid price on the first <br />invoice. <br />+2 See the invoice returned with Sandra Brown's Decision <br />+~ West slope topsoil replace and north end topsoil replace <br />was completed. <br />I made an error on my invoice and asked for 408 east pit <br />backfill west to east. It should have been east to west. <br />At the time of this billing it was 998 complete, we were <br />waiting on word on how much riprap we would need before we <br />finished the last 18 as that was where we were getting <br />riprap. <br />'1 .s We are starting to rebill items that have not been paid. <br />+s I had discussed Chens hill ditch payment with John Nelson <br />on the job. He indicated that 808 was ok. <br />+s See invoice returned with Sandra Brown's decision <br />regarding retainage. Hand written note. <br />.~ <br />Dozer rental TD-25 <br />June 9 6 hours <br />X83+~+©650 P.02 <br />see rental records <br />road in west pit <br />
The URL can be used to link to this page
Your browser does not support the video tag.