My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL44123
DRMS
>
Back File Migration
>
General Documents
>
GENERAL44123
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:12:58 PM
Creation date
11/23/2007 12:51:23 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983141
IBM Index Class Name
General Documents
Doc Date
9/26/1985
Doc Name
CAPACITY OF INTERIM DITCHES & FREEBOARD FOR TAILINGS POND
From
TZA
To
GOLD HILL VENTURES LIMITED PARTNERSHIP
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
! ~ <br />TZA TED ZORICH & ASSOCIATES, INC. <br />CONSUL 7ING ENGINEERS IN WATER RESOVRC ES <br />1221 sou11+ C:LAN91(S~LJN. +cc~ <br />DEM7ER. COLORADO 80210 <br />(303)777-058A <br />September 26, 1985 <br />®1~~~®s ~161J <br />Mr. Mark Steen <br />Gold Hill Ventures Limited SEP 26 198: <br />Partnership <br />Post office Box 1523 MINED LAND <br />Longmont, Colorado 80501 RECLAMATION DIVISION <br />Re: Capacity of Interim Ditches and <br />Freeboard for the Tailings Pond <br />Dear Mr. Steen: <br />As you requested, Ted Zorich and Associates, Inc. (TZA) <br />has estimated the required carrying capacity of_ the interim <br />ditches associated with the tailings pond, and the freeboard <br />required for the tailings pond dikes. The purpose of these <br />precautions is to insure that low quality water does not enter <br />the surrounding environment. <br />As you discussed, the tailings pond to be constructed will <br />have a 400 foot long dike and will extend 260 feet up slope <br />from the dike. Permanent ditches will be installed initially <br />to divert surface runoff around the 260 by 400 foot area. The <br />portion of the 260 by 400 foot area that is used will increase <br />with time. The 400 foot dike will be constructed initially and <br />the initial active area of the tailings pond will extend up <br />slope 50 feet. <br />The interim ditch will be located just over 50 feet up <br />slope from the dike and will collect surface water rl7noff that <br />occurs below the permanent drainage ditches and within the 400 <br />by 260 foot area, and carry this water off the tailings pond <br />area. As you stated, the distance up slope from the dike will <br />increase from 50 feet to 100 feet, then to 200 feet before <br />being extended to 260 feet. Interim ditches are planned to be <br />constructed each time the pond is expanded except when it is <br />expanded to the full 260 feet. The estimated drainage areas <br />and maximum runoff rates are given on the attached table. <br />TZA's recommended freeboard distance for the tailings pond <br />dikes is 0.5 feet. The 100 year, 24 hour storm is 4.6 inches <br />
The URL can be used to link to this page
Your browser does not support the video tag.