Laserfiche WebLink
Section Topic <br />2.06.7(5) Reclamation delay at combined <br />surface/subsurface mines <br />3.02.2(4) Adequacy of bond amount and terms <br />Midterm Review Methodology <br />Applicability at Hayden <br />Gulch Loadout <br />Inapplicable, surface <br />operations only. <br />Applicable. <br />For this Midterm Review, the Division reviewed the following documents: <br />1. Permit application, including stipulations and responses; <br />2. Revisions made to the permit since the last permit renewal; <br />3. Annual reclamation and hydrology reports; <br />4. Bond surety and reclamation cost estimate; <br />5. Division findings documents and previous Midterm Reviews; <br />6. Division inspection reports; <br />7. Notices of violations since last permit renewal, if any. <br />PART II -SUMMARY OF: OPERATIONS, REVISIONS TO PERMIT, <br />VIOLATIONS, STIPULATIONS, VARIANCES, AND BOND <br />Oaerations <br />The Loadout originally was part of the Hayden Gulch Mine, located about seven miles to <br />the south. Table 2, below, summarizes the history of Permit C-92-081. <br />Table 2 -Summary of history of Permit C-92-081 <br />Date Action <br /> <br />March 1978 Construction of the Loadout be ins. <br />Au ust 1978 HG Mine, the Loadout's, [hen, associate o erasion, be ins o erations. <br />12-16-80 Loadout's, [hen, corporate parent, HG Coal submits application for <br />reclamation ermit for HG Mine and Loadout. <br />1-04-81 Division issues ermit C-80-003 for HG Mine and Loadout. <br />Hayden Gulch Loadout Page 3 January 11, 2001 <br />Midterm Review <br />