Laserfiche WebLink
<br />Bond release Approval Decision phase Area <br />application no. status date <br /> <br />SL-5 Approved 12/6/96 I Eckman Park <br /> with Mine: Areas 51 <br /> conditions and 61 <br />SL-6 Approved 3/30/98 II/III Mine 2 <br />SL-7 Approved 12/27/00 II/III Mines 1, 2, and <br /> Eckman Park <br />Submittal of Bond Release Application and <br />Completeness Determination by the Division <br />The Division received the application for Phase [II bond release on October 17, 2001, and found <br />the application complete on October 22, 2001, after the Division received proof of publication of <br />the applicant's public notice. The completeness determination was made in accordance with <br />Section 3.03.2(1)(d). <br />CYCC submitted the bond release application following the procedures described in the Act and the <br />Regulations. The application also utilizes the Division's Guideline ReenrdLrQ Selected Conl Mirte <br />Borrd Release /ssues, dated April 18, 1995. <br />Public Notice <br />CYCC published notice of the bond release application in the Steuntboat Pilot once weekly for four <br />consecutive weeks, beginning on September 16, 2001. CYCC also notified landowners within and <br />adjacent to the mine permit area, and other interested parties of the application for bond release, as <br />required by Section 3.03.2(1). <br />Bond Release Inspection <br />The Division conducted a bond release inspection on November 2, 2001. The site inspection was <br />conducted in accordance with Section 3.03.2(2). Richard Mills represented CYCC; Daniel <br />Hernandez and Tom Kaldenbach represented the Division; Henry Austin represented the Office of <br />Surface Mining (USDOI); and Jim Chubrilo represented the Colorado Water Quality Control <br />Division. The Bureau of Land Management (USDOI) and other surface owners were notified of [he <br />inspection, but did not attend. <br />Technical Review <br />The Division reviewed technical aspects of CYCC's bond release submittal in order to determine <br />if Phase III bond release is warranted. The review evaluated the methods that CYCC used in <br />Mine 1 and the Eckman Park Mine Page 4 January 3, 2002 <br />Phase III Bond Release <br />