Laserfiche WebLink
<br />HOU@LY PHODUCTI01: cont'd Sheet 2 of 2 <br />................. <br />Loader Cycle Tice cont'd <br />................. <br />Bolling Resistance <br />Roaduap underfooting conditions: <br />Haul :Butted dirt, little/no maint.,l-2" fire pen. <br />8eturn:Butted dirt, little/no .taint„ 1-2" fire pen. <br /> Crade Bolling Total Travel <br /> Length Resist. Besist. Besist. Tire <br />Haul iE return Time: (ft) (%j (%I (%) (rin.l <br />Haul 3oute; 120 2,00 5,00 7.00 D.lE6 (CHB )cx) <br />Return @oute: 120 -2.00 5.00 3.70 0.127 (CEB uxy) <br /> Total travel lice = 0.293 <br /> Tota: cycle time = 0.723 cinutes <br />Loader Bucket Capacity <br />Bated Capacity= 2,75 LCY (heaped] <br />Bucket fill factor- 0.9C0 Other - soil, houlders, rants (80 -1CD?:) <br />Adjusted capacity= 2.18 LCY <br />Job Cocdition Correction Factors <br />Site altitude = 8,200 ft. <br />altitude correction factor = 0.98 (CHB cdhl <br />Job efficiency factor : 0.83 (!sh(day) <br />Net Correction : 0.81 multiplier <br />Unadjusted Hcurlp Uait Prcduction 205.36 LCY)Bt <br />Adjusted Hourly Unit Production 167.04 LCP/Hr <br />Adjusted Hourly Fleet Production 147,04 LCY/Hr <br />JOB COBT <br />Fleet size c 1 Loader(s) Total job ti.e c 3,21 Hours <br />Cnit cast = 50.294 /LCY <br />....... Total job cost = ;156.60 <br />........... <br />