Laserfiche WebLink
• • <br />HOURLY P@OOUCTION cor.t'd Sheet 2 of f <br />Loader Cycle Tice cont'd <br />Rolling P.esistance <br />Roadway underfooting conditio ns: <br />Haul :Butted dirt, little/no caint.,l-2' fire pen. <br />Heturn:Rutted dirt, little/no ¢sint.,l-2' fire pen. <br /> Crude Bollimg Tota] Trove: <br />i Length Resist, flesist. Resist, 'ice <br />Haul b return Time: (ft( (E( (%1 (~( (min.( <br />~, Haul @oute: 500 20.00 5.00 25.00 1.318 (CHB ,mr' <br />Return @oute: 500 <br />......... -20.00 <br />............ S.OL <br />.......... -15.00 <br />....... ... 0.173 (CH9 urgj <br />... <br /> Tot al travel time = 2,118 <br /> To tal cycle time = 1,538 minutes <br />~ Loader 8'~cket Capaci ty <br />Bated Capacity- 2.75 LCY ;heaped) <br />bucket fill factor= 0.875 Loose ¢et.- I' and ove r diaceter (85 - 90'r'( <br />Adjusted capacitq= 2.41 LCY <br />dob Condition Correction Pactors <br />Site altitude = 8,280 ft. <br />A1!itude correction factor = 0.98 (CHB cdhl <br />!mb efficiency factor = 0.81 (Ishldapl <br />Het Correction . 0.81 mcltiplier <br />i Onedjusted Hourly Unit Production : 56.69 LCY/Hr <br />Adjusted Hourly Unit Production 46.28 LCY/Hr <br />Adjusted Hourly Pleet Production 46.28 LCi/Hr <br />.....,., <br />I y0B CO5T <br />Fleet siee = 1 Loaders( Tota] ;ab lice = 69.99 Hours <br />....... ........... <br />Unit cost =1,061 /LCY Total job cost = X3,437.37 <br />....... ........... <br />