My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL43920
DRMS
>
Back File Migration
>
General Documents
>
GENERAL43920
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:12:43 PM
Creation date
11/23/2007 12:42:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983141
IBM Index Class Name
General Documents
Doc Date
7/17/1987
Doc Name
CASH MINE FILE M-83-141
From
GOLD HILL VENTURES
To
MLRD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />INSPECTION/TESTING REPORT <br />FORM 65, MARCH 1984 <br />B-A-I <br />'1 ~~,~ <br />Denver EngineeringCorporation <br />1626 Cole Boulevard <br />Suite 300 Building 7 <br />Golden,Colorodo 80401 <br />(303) 233.0533 <br />T0: Mined Land Reclamation Div. <br />J. R. Abbott Construction <br />DEC File #245.002 <br />roj, Np, 245.002 Date 11/11/85 <br />Project <br />Gold Hill Mill/Tailings Pond <br />Cnvner <br />Gold Hill Ventures <br />Contractor <br />J. R. Abbott Construction <br />Contractoz Superintendent <br />R. Barcom <br />Subcor.tzactor <br />N/A <br />Subcontractor Superintendent <br />N/A <br />Bather Conditions <br />emp N/p ' at N/A AM <br />em ' at PM <br />bservation 11/1, 11/5, 11/7, 1985 <br />eriod <br />Onsite field inspections and tests were provided by the undersigned on the above dates for <br />the project. All tests were taken per A.S.T.M. requirements, inspections were based on the <br />requirements as set forth in .the approved amendment application, File #M-83-141 by the <br />Division of Mined Land Reclamation. <br />A complete inspection of the Hazel-A Adit was also conducted to determine its use as a <br />storage reservoir. The bulkhead design was reviewed (see attached) and found to be <br />satisfactory. <br />All inspections, tests and materials used were in compliance with the plans, specifications <br />and the approved amendment application #M-83-141. We hereby certify to these inspections <br />and materials used. <br />Copies to: <br />Sheet <br />of <br />
The URL can be used to link to this page
Your browser does not support the video tag.