My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL43769
DRMS
>
Back File Migration
>
General Documents
>
GENERAL43769
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:12:34 PM
Creation date
11/23/2007 12:37:58 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980006
IBM Index Class Name
General Documents
Doc Date
8/3/1981
Doc Name
EMISSION PERMIT FUGITIVE DUST /final approval
Permit Index Doc Type
Other Permits
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• ~ _. ., Tcannj A;v~ ~:atJUa IUi;a: 11iu1NURTaiVTi ~ ,CH: .. ~ ,... tip. ~ ... <br />i. T,ila pi,7^:; IS i55Ued in reliance Ut ^!1 th^ ^^^~"a Cy znd completeness of information <br />auNN~~~d ;;r ;`,c a;,~licc^t cnd is ce„r~';^~^~ ;:;.on construction, installation and operation <br />in accordance with this information Arid w;tn representations mace by the app;;cant or its <br />d yei,u. <br />2. Tht= ;permit is valid only forme equipment and operations specificalt, id^ntaied herein. - - ~ <br />3. Eacn and every condition of this permit is a material part hereof and is not severable. Any <br />challenge to, or appeal of, a condition h~,-c:,; s;tall constitute a rejection of the entire permit <br />and upon such occurrence this permit shall be deemed denied ab initio. <br />4. This permit may be revoked at any time prior to final appro:al by the Air Pollution Control <br />Division (APCD) on grounds set forth in the Colorado Air Quality Control Act and <br />regulations of the Air Quality Control Commission (AQCC), including failure to meet any <br />_ express term or condition of the permit. <br />5. This permit must be retained and made available for inspection upon request at. the <br />-- - -- -- coca ;on se -foci h erein: SNit11-tespeat to a portable source-which is moved taa-new - - - -- ~- - <br />Location, acopy ofthe revised Air Pollutant Emissions Notice (APEN) (required by lawto ~ <br />be submitted to the APCD whenever a portable source is relocated) should be attached to <br />this permit. The permit may be reissued to a new owner as provided in Section III.B. of <br />AQCC Regulation No. 3 upon transfer of ownership. <br />6. Initial approval of an emission permitdoes not provide "final authority foroperation ofthis <br />• source. Final approval of the permit must be secured from the APCD in writing in <br />accordance with the provisions of C.R.S. 1973, Section 25-7-114(4)(j) and Section IV.H. of <br />_ AQCC Regulation No. 3. Final approval cannot be granted until construction iscompleted <br />and operation-and construction have-been verified by the APCD as conforming in all <br />respects with the conditions of the initial approval permit. <br />7. You MUST notify the APCD at least thirty days (fifteen days for portable sources) prior to <br />commencement of the permitted operation or activity. Failure to do so is a violation of <br />C.R.S. 1973, Section 25-7-114(4)(j) and Regulation No. 3., Section IV.H.1., and can resultin <br />the revocation of the initial approval permit. <br />8. You MUST obtain final approval within six months of the commencement of operation as <br />that term is defined by the AQCC. Failure to obtain final approval will result in the <br />revocation of the initial approval permit. <br />9. If the APCD determines that the terms and conditions of the initial approval permit have <br />been satisfied, the APCD will issue a final approval permit, which does constitute'Yinal" <br />authority to operate as discussed in Paragraph 6 above. <br />10. Violation of the terms of a final approval permit or of the provisions of the Colorado Air <br />Quality Control Act or the regulations of the AQCC may result in administrative, civil or <br />criminal enforcement actions under C.R.S. 1973, Sections 25-7-115 (enforcement), 25-7- <br />121 (injunctions), 25-7-122 (civil penalties) and 25-1-114 (criminal penalties). <br />11. Unless specifically stated otherwise, the general and special conditions contained in <br />this permit have been determined by the APCD to be necessary to assure compliance <br />• with the provisions of C.R.S. 1973, 25-7-114(4)(8) and, as such, shall be enforceable <br />under the provisions of C.R.S. 1973, 25-7-115 afterfinal approval of the permit has been <br />granted. 1 - - <br />
The URL can be used to link to this page
Your browser does not support the video tag.