Laserfiche WebLink
iii iiiiii iiiiiiiiii <br />999 <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1 J 13 Sherman St., Room 215 <br />Denver, Colorado 80?Ol <br />Phone: 1703) 866-}567 <br />FA%: 1303) D32-6106 <br />March 13, 1995 <br />Mr. Brad Gosche <br />National King Coal <br />P.O. Box 2905 <br />Durango, CO 81301 <br />Re: Kiug Coal Mine (Permit No. C-81-035) <br />Midterm Review <br />Dear Mr. Gosche: <br />~-~. <br />II~~~ <br />DEPARTMENT OF <br />NATURAL <br />RESOURCES <br />Roy Romer <br />Governor <br />lames 5. Lxhhead <br />E[eculive Director <br />Michael 8. Long <br />Drvis~on Director <br />We have completed a midterm review of the King Coal Mine permit, as required by <br />Rule 2.08.3(1). Division staff reviewed and reevaluated the currently approved permit <br />application package, previous Division "Proposed Decision and Findings of Compliance" <br />documents, permit stipulations and their status, revisions to the permit during this term, <br />monitoring repoRS, and inspection reports. The enclosed document is a summary of the <br />Division's Findings as a result of the review. <br />Based on our review, the Division is requiring modification of the King Coal Mine permit to <br />adequately address concerns identified in Section IV of the document. Please note that the <br />revision application(s) must be submitted no later than May 19, 1995. <br />Should you have any questions or need additional information, please contact me. <br />Sincerely, <br />~~~/~ <br />Harry B. Ranney <br />Environmental Protection S eci 'st <br />P <br />HBR/bjw <br />Enclosure <br />c: Tom Bird, National King Coal, w/enclosure <br />Thomas Ehmett, OSM-AFO, w/enclosure <br />Rick Holbrook, OSM-WSC, w/enclosure <br />STATE OF COLORADO <br />M: \OSS\BJ W\F{HR <br />