My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL43654
DRMS
>
Back File Migration
>
General Documents
>
GENERAL43654
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:12:27 PM
Creation date
11/23/2007 12:31:44 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001035
IBM Index Class Name
General Documents
Doc Date
8/11/2004
Doc Name
Stipulations to the Permit
From
DMG
To
ACA Products Inc.
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />RmER TO MINING PERMIT <br />Pemrit Date: September 19, 2001 <br />PemritNo: M-2001-035 <br />n <br />u' <br />The following adddianal stipulations and oondaions fiorrn an integral part ofthe foregoing permR: <br />Stipulation No. Description <br />The quany cut sktpea will be m aceordance with the adequacy response recommendations <br />of R. J. Iri~r in his report "R,ock Cut Slope Stability Assessment, Planned Rock Quarry, <br />Trout CrceJc Valley, Chaffee County Cobrado, Job No. 559". The as slopes will ba <br />benched with 10 feet wide steps spaced about 20 feet apart m ek~ration ark with risers dril!- <br />and-blast excavated to .25h:1v (76° slopes). The risers of the ctu-stripe will be dressed by <br />barring dawn krase rack. The 6eatdtes will be sloped to they tetminis to lirt»t seepage imo <br />the jointed rack. A drainage d¢dr will be excavated immediately up slope of the quarry to <br />divert surface water nmoffarouod the quarry. <br />2. ACA Products will prepare industry standard blast reports for each blast in the quarry <br />and, copies will be submitted to the Division with each annual report. <br />A maximum charge weigfit of 42 Ibs. per delay will not be exceeded without Division <br />approval. Nine millisecond delays will be used. The delay time will not be lessened <br />without Division approval. <br />Each blast in the quarry will be monitored at the dam. A seismograph will be placed <br />on bedrock at the base of the dam. Blast frequency and peak particle velocity will be <br />measured for each blast. Blast frequencies will be limited to no less than 30 Hz. Peak <br />particle velocity wilt not exceed 2 ips. The dam seismograph monitoring data will be <br />kept by the operator and made available to the Division upon request. <br />MINED LAND RECLAMATION BOARD <br />COLORADO DEPARTMENT OF NATURAL RESOURCES <br />,~ 1 <br />MICHAEL B. LON <br />Division Director <br />
The URL can be used to link to this page
Your browser does not support the video tag.