My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-06-06_GENERAL DOCUMENTS - M1974052
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1974052
>
2001-06-06_GENERAL DOCUMENTS - M1974052
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2023 5:55:36 PM
Creation date
11/23/2007 12:31:41 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1974052
IBM Index Class Name
General Documents
Doc Date
6/6/2001
Doc Name
GROUNDWATER MONITORING WORK PLAN VARRA COAL ASH BURIAL PROJECT WELD CNTY COLO CGRS 1-135-2755AA
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CGRS, Inc. <br />• References (e.g. other clients); and <br />• Experience (UST, RCRA and other environmentally related projects). <br />• Service; <br />• Turnaround time; and <br />• Technical input (e.g., recommendations on analytical procedures). <br />The project manager is encouraged [o gather pertinent laboratory-selection information prior to extensively <br />defining analytical requirements under the project. A request may be made to a laboratory to provide a <br />qualifications package that should address the points listed above. Once the project manager has reviewed <br />the various laboratory qualifications, further specific discussions with the laboratory or laboratories should <br />take place. Tn addition, more than one laboratory should be considered. For large-scale investigations, <br />selection of one laboratory as a primary candidate and one or two laboratories as fall-back candidates <br />should be considered. <br />The quality of the laboratory service provided is dependent on various factors. The project manager should <br />be able to control the quality of the information (e.g., samples) provided to the laboratory. It is extremely <br />important that the project manager communicate to the laboratory all the requirements relevant to the <br />project. This includes the number of samples and [heir matrices, sampling schedule, parameters and <br />constituents of interest, required analytical methodologies, detection limits, holding times, deliverables, <br />level of QA/QC, and required turnaround of analytical results. <br />Field and Laboratory Oualitv Control <br />General <br />Quality control checks are performed to ensure that the data collected is representative and valid data <br />Quality control checks are the mechanisms whereby the components of QA objectives ore monitored. <br />Examples of items to be considered are as follows: <br />I. Field Activities: <br />• Use of standardized checklists and field notebooks; <br />• Verification of checklist information by an independent person; <br />• Strict adherence to chain-of-custody procedures; <br />• Calibration of field devices; <br />• Collection of replicate samples; and <br />• Submission of field blanks, where appropriate. <br />3. Analytical Activities: <br />
The URL can be used to link to this page
Your browser does not support the video tag.