Laserfiche WebLink
-8- <br /> RIDER TO MINING PERMIT <br /> Permit Date: February 28, 1997 <br /> Permit No: C-84-065 <br /> The following additional stipulations form an integral part of the foregoing permit: <br /> Stipulation No. Description <br /> 4. THE PERMITTEE MUST AT ALL TIMES SUPPLY ADEQUATE WATER FOR <br /> FLOOD IRRIGATION OF THE ALLUVIAL VALLEY FLOOR BELOW THE <br /> VULCAN DITCH. IF, AT ANY TIME DURING THE IRRIGATION SEASON <br /> (MAY, JUNE, JULY, AUGUST, AND SEPTEMBER), THE FLOW IN THE <br /> VULCAN DITCH DROPS BELOW 1.6 CUBIC FEET PER SECOND, THE <br /> PERMITTEE MUST RECEIVE DIVISION APPROVAL, BASED ON A <br /> DEMONSTRATION THAT THE WATER IS NOT NECESSARY FOR IRRIGATION <br /> OF THE AVF, BEFORE USING THE WATER IN THE MINING OPERATION. <br /> 27. NO LATER THAN OCTOBER 1, 1997, THE OPERATOR WILL SUBMIT AN <br /> AMENDED IRRIGATED HAYLAND PRODUCTION STANDARD REFLECTIVE <br /> OF THE POTENTIAL PRODUCTION UNDER IRRIGATED CONDITIONS FOR <br /> THE AFFECTED SOIL TYPES IN A NORMAL YEAR, ASSUMING PRUDENT <br /> MANAGEMENT CONSISTENT WITH REGIONAL PRACTICES. THE <br /> STANDARD WILL BE SUPPORTED BY NRCS SOIL SURVEY INFORMATION, <br /> OR COMPARABLE TECHNICAL DOCUMENTATION. <br /> ALTERNATIVELY, A REFERENCE OR COMPARISON AREA MAY BE <br /> ESTABLISHED ON ADJACENT IRRIGATED HAYLANDS, UPON <br /> DEMONSTRATION THAT THE ADJACENT LANDS ARE COMPARABLE TO <br /> THE AFFECTED AREA WITH RESPECT TO SOIL TYPE AND CROP SPECIES, <br /> AND THAT PRUDENT MANAGEMENT CONSISTENT WITH REGIONAL <br /> PRACTICES WOULD BE APPLIED TO THE ADJACENT LANDS THROUGHOUT <br /> THE LIABILITY PERIOD. <br /> 28. WITHIN 60 DAYS OF THE DIVISION'S PROPOSED DECISION TO RENEW THE <br /> COAL RIDGE NO. 1 MINE PERMIT,NCIG FINANCIAL, INC. MUST SUBMIT TO <br /> THE DIVISION PROOF THAT IT IS IN GOOD STANDING WITH THE <br /> SECRETARY OF STATE OF THE STATE OF COLORADO, AND THAT IT IS <br /> AUTHORIZED TO CONDUCT ITS AFFAIRS AND TRANSACT BUSINESS <br /> WITHIN T14E STATE. <br />