Laserfiche WebLink
b. Limiting [rave] for routine maintenance activities to between 10 a.m. and 2 p.m. <br />during December, January, Mazch and April when big game animals are present. <br />Stipulation No. 48 <br />COVCC will submit and obtain approval of additional bond, required for reclamation <br />of the rock slope tunnels, before beginning construction of these tunnels. The required <br />bond amount is identified in tasks 19 and 85c of the Division=s January 10, 1994 bond <br />estimate for the Orchazd Valley Mine. Bond for these tasks are currently deferred. <br />Stinulation No. 53 <br />Before mining resumes, BRL will submit, and obtain Division approval for, a <br />revision that addresses the planned mining sequence for the remainder of the existing <br />permit term. <br />Stipulation No. 54 <br />Approval of Permit Renewal No. 3 for the Bowie No. 1 Mine is conditioned upon the <br />resolution of the following: <br />1) Kentucky citation no. C98-081-414-001, associated with Star Fire Mining Company; <br />2) Kentucky forfeiture, cessation orders nos. 00265 and 050320 and civil penalties nos. <br />052522, 052908 and 053099 for permit no. 8980140, associated with Catawaba Industries; <br />Proof of resolution should be submitted to the Colorado Division of Minerals & <br />Geology as soon as it becomes available. <br />