Laserfiche WebLink
Most of the surface facilities aze existing structures that will remain in their present state for the <br />life of mine. The only major area of active, ongoing, final reclamation will occur at the waste <br />rock disposal azea. As portions of this pile are completed, final regrading, retopsoiling and <br />revegetation have occurred and will continue to occur. <br />At the conclusion of mining, the portals will be seeded, all surface facilities will be removed, the <br />mine benches will be recontoured, the loadout will be regraded to approximate original contour, <br />and all azeas will be revegetated in accordance with the approved post-mining land use and <br />revegetation plan. However, there is a possibility that the train loadout will continue to operate <br />for many years, as a loading facility for coal from other mines, after the rest of the mine site has <br />been reclaimed. <br />20 <br />