Laserfiche WebLink
In contacting the U.S. Fish and Wildlife Service (USFWS) three endangered fish species were <br />noted as potentially being impacted indirectly by the operation: <br />Federally-listed Species <br />XIV. <br />XV <br />Colorado squawfish <br />Humpback chup <br />Bonytail chub <br />Prichocheilus lucius <br />Gila cvaha <br />Gila elegans <br />While the proposed activity is not directly located in areas currently occupied by any of the above <br />fishes, the USFWS believes that any depletion of water from the Upper Colorado River Basin <br />(UCRB) may have negative impacts on these endangered fishes. Simply put, water that leaves <br />the UCRB before reaching habitat areas for listed fishes may actually cause cumulative <br />deterioration of downstream, occupied habitat. In this way depletions are thought to contribute to <br />the fishes' decline. <br />The operator submitted a report of the potential for depletions to the UCRB as part of the <br />Orchard Valley (Bowie No. 1) West Mine permit revision request. The Division agreed with <br />those findings. The operator predicted that 26.7 acre feet ofwater could be depleted by the <br />operation. The Office of Surface Mining relayed this information to the USFWS. This impact is <br />minimal but was be mitigated by the operator through financial compensation to a FWS fund set <br />up for the endangered species. Both OSM and FWS are satisfied with this arrangement, which is <br />in use for other Federal projects impacting the UCRB. Stipulation No. 42, attached to the 1993 <br />permit renewal no. 2 document, required the applicant to submit water depletion information for <br />the purpose of calculating the financial compensation amount. This stipulation was complied <br />with through Minor Revision No. 93. <br />In Technical Revision No. 32, a second water depletion estimate was made concerning a <br />proposed increase in the production rate from 1 million to 5 million tons per year at the Bowie <br />No. 1 unit train loadout. The water depletion estimate that was calculated by BRL amounted to <br />155.6 acre-feet. This information was forwarded to the U.S.D.A.-Forest Service for review, <br />through OSM. BRL made a one time payment to the Forest Service to mitigate the effects of the <br />estimated water depletion. <br />On the basis of available information, this Division finds that the proposed operation will not <br />affect the continued existence of threatened or endangered species or result in the destruction or <br />adverse modification of their critical habitats (2.07.6(2)(n)). <br />Fish and wildlife habitat is a planned post-mining land use. The applicant has selected <br />appropriate plant species and distributions to benefit fish and wildlife (4.18(4)(1)). <br />Protection of Underground Mining -Rule 4.19 <br />This Section is not applicable to the Bowie No. 1 Mine permit. <br />Subsidence Control -Rule 4.20 <br />Subsidence is discussed on pages l36 through 165 of Section 2.05 in Volume 1. Subsidence <br />appendices are found in Volume 3. Baseline documentation of surface water features potentially <br />impacted by subsidence are located in Volume 4. Annual hydrologic reports and subsidence <br />reports have been produced annually since 1982 and exist asstand-alone volumes. <br />36 <br />