Laserfiche WebLink
15. The Division finds that the activities proposed by the applicant would not affect the <br />continued existence of endangered or threatened species or result in the destruction or <br />adverse modification of their critical habitats (2.07.6(2)(n)). <br />16. The Division has contacted the Office of Surface Mining, Reclamation Fees Branch. As <br />of this time, Seneca Coal Company, the operator is current in the payment of reclamation <br />fees required by 30 CFR Chapter VII, subchapter R (2.07.6(2)(0)). <br />SECTION B -Rule 4 <br />I. Roads -Rule 4.03 <br />The Seneca II-W Mine utilizes three types of roads within the permit area. Haul roads <br />will be used to haul coal from the pit to the Hayden Station or the Hayden Gulch <br />Loadout. One access road is permitted to access the shop facilities of the coal carrier at <br />the east end of Tie Across Haul Road (TAHR). A number of existing light use roadsare <br />used to gain access to monitoring facilities and reclamation areas. All roads within the <br />permit boundary are depicted on Exhibits 12-2 and 12-3 and discussed in Tab 13. <br />A. Haul Roads <br />Haul Roads A, G, a portion of F, H and I have been constructed at the Seneca II-W <br />Mine. In addition, approximately 4.1 miles of the Tie Across Haul Road (TAHR) <br />was constructed from the Hayden Power Station to Routt County Road 53. <br />Proposed Haul roads J, K and L will be constructed as mining proceeds into the II- <br />W south extension area. All haul roads are depicted on Exhibits 12-2 and 12-3. As- <br />built certifications for constructed haul roads and the design plans for proposed haul <br />roads are presented in Tab 13. <br />The culvert designs in the permit depict several multiple culverts for a road crossing. <br />In all cases where the multiple culverts are used, the combined end areas are greater <br />than 35 square feet. Rule 4.03.1(4)(e)(i)requhes all culverts with end areas greater <br />than 35 square feet be designed to convey flows from the 20-year-24-hour storm. <br />The applicant has complied with this regulation. <br />With the exception of certain haul road segments which will be retained in reduced <br />configuration for post-mining ranch roads, all roads will be reclaimed to AOC and <br />revegetated. Those road segments which will be reduced to a 20 foot travel width <br />to replace pre-existing ranch roads include the Mine Entrance Haul Road (MEHR), <br />haul roads A and G and the first segment of Haul Road F. The Division approved <br />the retention of the haul roads depicted on Exhibit 20-2, since it is compatible with <br />Seneca II-W Findings Document 15 June 15, 2001 <br />Permit Renewal No. 3 <br />