Laserfiche WebLink
Continuance of Rider to Mining Permit <br />,~ <br />Stipulation No. 1 "` ~~ ~. `~ <br />PRIOR TO CONSTRUCTION OF THE ACCESS ROAD, THE APPLICANT MUST SUBMIT <br />SITE SPECIFIC DESIGN STANDARDS FOR EMBANKMENT STABILITY, FOR DIVISION <br />APPROVAL. THE ANALYSIS SHALL BE CONDUCTED IN CONFORMANCE WITH RULE <br />4.03.1(3)(d)(vii). THE DESIGN STANDARDS SHALL BE SUBMITTED AS A <br />REVISION TO THE PERMIT APPLICATION. <br />,Stipulation No. 8 <br />THE DIVISION REQUIRES THE PERMITTEE IN THE EVENT THAT SINKHOLE <br />SUBSIDENCE COLLAPSE WERE DETERMINED, BY THE DIVISION, TO CONSTITUTE <br />POTENTIAL HAZARD TO THE PUBLIC HEALTH AND SAFETY, TO IMPLEMENT <br />APPROPRIATE SEALING AND BACKFILLING OF SINKHOLE COLLAPSE FEATURES. <br />Stipulation No. 9 <br />THE DIVISION REQUIRES THE PERMITTEE IN THE EVENT THAT ANY SLOPE <br />INSTABILITY IS DETERMINED BY <br />AFFECTED AREA, TO SUBMIT TO <br />CAUSES AND RESULTANT HAZARDS <br />THIS ANALYSIS, THE DIVISION <br />REPRESENTED BY ANY SPECIFIC <br />STABILIZATION PROGRAM SHOULD <br />Stipulation No. 10 <br />THE DIVISION TO HAVE DEVELOPED WITHIN THE <br />THE DIVISION FOR REVIEW AN ANALYSIS OF THE <br />OF ANY SUCH UNSTABLE SLOPE AREA. USING <br />SHALL DECIDE WHETHER A HAZARD IS <br />SLOPE MOVEMENT EVENT AND WHETHER A SLOPE <br />BE DEVELOPED AND IMPLEMENTED. <br />IF THE U.S. BUREAU OF MINES AND THE PERMITTEE HAVE NOT AGREED TO A <br />SUBSIDENCE MONITORING PROGRAM ACCEPTABLE TO THE DIVISION PRIOR TO <br />COMPLETION OF THE ROCK TUNNEL, THE DIVISION WILL REQUIRE THE PERMITTEE <br />TO AMEND ITS CURRENT SUBSIDENCE MONITORING PROGRAM. FURTHER, NO MINING <br />SHALL OCCUR WITHIN THE COAL SEAM UNTIL THE PERMITTEE HAS OBTAINED <br />APPROVAL FROM THE DIVISION FOR THE AMENDED SUBSIDENCE MONITORING <br />PROGRAM. <br />Stipulation No. 11 <br />THE DIVISION DIRECTS THE PERMITTEE TO PREPARE AND SUBMIT A FORMAT FOR <br />THE REQUIRED SEMI-ANNUAL SUBSIDENCE MONITORING REPORTS. THIS PROPOSED <br />REPORT FORMAT SHALL BE SUBMITTED FOR DIVISION REVIEW WITHIN SIX MONTHS <br />FOLLOWING ISSUANCE OF THE PERMIT. FURTHER, THE PERMITTEE SHALL HAVE <br />OBTAINED APPROVAL OF THE SUBSIDENCE REPORT FORMAT PRIOR TO ANY MINING <br />6i G <br />~,: <br />l <br />VJ <br />a` <br />/`, ; <br />WITHIN THE COAL SEAM. <br />