Laserfiche WebLink
<br /> <br />1. The White Cloud dump has not been disturbed. There is not future plans to <br />disturb this dump. (Item 3: February I5, 1995) <br />1. ...the Wynona and Oscar dump and shaft area have been graded as part of the <br />mill construction. (Item 3: Apri128, 1995) <br />- The Oscar dump no longer exists. (Item 3: February 15, 1995) <br />1. The Left Hand Creek Pump location is on land leased by COM Inc. The <br />pump will remain in place to be used by the land owner after Gold Hill mill <br />reclamation. (Item 3: Apri128, 1995) <br />1. The process water line from the bore hole into the Time Mine to the mill was <br />evidently completed several years ago and any trench that was dug cannot be <br />detected. A short distance of pipe that is above ground will be cut off and the <br />end covered when the mill is reclaimed. The pump will be removed from the <br />borehole into the Time Mine and the top of the borehole permanently capped. <br />(Item 3: June 21, 1995) <br />1. It appears that most of the electrical equipment was new in 1984 or 1985 <br />when the mill was built. New equipmem should not have been sold with any <br />PCB's. There might be older motors with capacitor starts that might be in the <br />building but should not be significant. Building insulation appears to be <br />batt-type fiberglass with a plastic backing. We do not foresee a lazge expense <br />to the Division related to hazardous waste. (Item 3: July 18, 1995) <br />t~.~..+~m. Golder Associates <br />