Laserfiche WebLink
ch <br />f <br />The haul road from about station 125+00 shown on Map 16 to station 6+00 shown on <br />Map 95266-05, a total of about 600-feet, is new construction. This road was <br />constructed during the second quarter of 1998. No compaction tests were performed <br />on the embankment, however, I inspected the construction on numerous occasions and <br />observed that a suitable compactive effort was applied to the road embankment with a <br />sheepsfoot compactor. Cut and fill slopes conform to the requirements of Rule <br />4.03.1(3)(d) and 4.03.1(3)(e)(ix). The grade of the haul road meets the requirements of <br />Rule 4.03.1(3)(a) but it is not in accordance with the profile presented on Map 95266- <br />05. About 225 feet of this road segment exceeds 10% grade. There is no place on this <br />road Thal exceeds a Pilch grade of 15% and the overall road grade is less Than 10%. <br />Except as explained above, to the best of my knowledge and belief, the gob pile haul <br />road was constructed as designed and in accordance with the approved plan. <br />~~~ ~//B <br />James E. Stover ~~ D e <br />P.E. No. 19230 <br />