Laserfiche WebLink
Stipulation No. 48 <br /> SUBMIT REVISED SECTION 2.05 IN THE PERMIT DOCUMENT UPON APPROVAL OF <br /> TECHNICAL REVISION NO. 64. <br /> STATUS: Complied With <br /> Stipulation No. 49 <br /> MOUNTAIN COAL COMPANY MUST ADDRESS THE DIVISION'S ASSERTION THAT A <br /> TOPSOIL DEFICIT FOR FINAL RECLAMATION EXISTS. IF THERE IS A DEFICIT, <br /> MCC MUST PROVIDE A DETAILED PLAN WHICH SPECIFIES HOW THE DEFICIT WILL BE <br /> ACCOMMODATED. IF SUBSOIL IS DESIGNATED AS A SUITABLE GROWTH MEDIUM, <br /> THEN THE PERMIT SHOULD BE REVISED TO SPECIFY HOW MUCH SUBSOIL WILL BE <br /> UTILIZED, WHERE IT WILL BE STORED, AND HOW IT WILL BE PROTECTED. A <br /> REVISION ADDRESSING THE ABOVE SHOULD BE SUBMITTED TO THE DIVISION ON OR <br /> BEFORE OCTOBER 29, 1993. <br /> STATUS: Complied With <br /> Stipulation No. 50 <br /> DITCH DESIGNS ASSOCIATED WITH THE RELOCATED TOPSOIL PILE SHOULD BE <br /> PROVIDED BY OCTOBER 18, 1993, TO BE INCORPORATED INTO EXHIBIT 66. THE <br /> DESIGNS SHOULD REFLECT STORM EVENTS APPROVED IN TECHNICAL REVISION NO. <br /> 64 AND SHOULD BE COMPLETED IN ASSOCIATION WITH TECHNICAL REVISION <br /> NO. 65. UNTIL THAT TIME, DITCHES SHOULD BE CONSTRUCTED TO HAVE MINIMUM <br /> DESIGNS AS REQUIRED BY DITCHES D1-4 AND D2-2D. <br /> STATUS: Complied With <br /> Stipulation No. 51 <br /> THE DIVISION 4 WATER COURT SHALL BE NOTIFIED OF THE NEW POND LOCATIONS <br /> WITHIN 45 DAYS ON DMG'S PROPOSED DECISION. IN ADDITION, A DAM SAFETY <br /> REVIEW SHALL BE COMPLETED ON MB-2 AND MB-3 WITHIN 45 DAYS AFTER <br /> CONSTRUCTION OF THE PONDS IS COMPLETED. (COMMENTS RECEIVED FROM THE <br /> DIVISION OF WATER RESOURCES DATED SEPTEMBER 17, 1993.) <br /> STATUS: Active <br /> Stipulation No. 52 <br /> SUBMIT TYPICAL CROSS-SECTIONS, DETAILS OF DISTURBANCE THAT WILL OCCUR <br /> AND RECLAMATION WORK TO COMPLETED FOR THE EXPLORATION ROAD THAT WILL BE <br /> CONSTRUCTED IN LONE PINE GULCH. <br /> STATUS: Complied With <br /> Stipulation No. 53 <br /> ALL UNRESOLVED PERFORMANCE STANDARD ISSUES AND SUBMITTAL <br /> REQUIREMENTS,SUCH AS, BUT NOT LIMITED TO, GEOTECHNICAL STABILITY ISSUES, <br /> SEDIMENT CONTROL PLANS, BONDING REQUIREMENTS, AND REVISED PAGE, MAP, <br /> AND/OR EXHIBIT HARD COPY SUBMITTALS, SHALL BE SUBMITTED AND APPROVED BY <br /> THE APPROPRIATE REVISION PROCESS, PRIOR TO PROJECT INITIATION. <br /> STATUS: Complied With <br /> Summary <br /> The Review Process <br /> Mountain Coal Company (MCC) , formerly the West Elk Coal Company, applied on <br /> November 6, 1979 for a permit to conduct underground mining and reclamation <br /> operations at the West Elk Mine, formerly the Mt. Gunnison No. 1 Mine. <br /> The application was determined to be complete on November 29, 1979 . The first <br /> review comments from the Division of Water Resources were received on <br /> March 26, 1980, and comments from the Division of Wildlife were received on <br /> 3 <br />