Laserfiche WebLink
C~ <br />• <br />Rcrlanuuion: <br />Reclamation of the area conunrnrrd in April 21102 after the structures were removed. <br />F:yuipntent selected }i+r the earthwork consisted of a l)-K Unzer with a scraper <br />attachnunt, a U-8 dozer with Made. U-~ dozer, truck excavator, and vibratory compactor. <br />The U-R darer with scraper was used a? build the slope back to approximate original <br />contour with the ll-8 dozer with blade assistine. The vihraton• compactor was used to <br />compact rack scraper load ur lilt added to the slope. The track excavator Baas used to <br />install culvert, a?nswct ditches, and load the scraper with topsoil. 7 hr [)-K dozer with <br />blade and the D-5 dozer with blade were utilired to drys. the slope, spread topsoil. and <br />"qu;vter-track" the a>psoiled slope ut final contigurutian. <br />Approximately 2.0 acres of area weer reclaimed at the pi+rtal area. another QS acre was <br />reclaimed ^t the topsoil pile harrow area and 2.0 acres were reclaimed along the pipeline <br />~~I fnncerline eorridor. Dnruicast seeding, t'ertilizing, mulching. and aspen blanket <br />i~ ~;~;:Il:ttion began on 1v9ay 17. 2002 and was completed play 2d. 2003. Approximately <br />~,' acre had aspen shaving blanket applied on the steeper sections of the slope. The <br />I'huto No. 6, Courtesy of CDM11G, Jim Darnell, June 14, 2001. [,one Pine Fan Faciliq~ <br />Iluoking ~cestl. <br />