My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL43011
DRMS
>
Back File Migration
>
General Documents
>
GENERAL43011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:11:46 PM
Creation date
11/23/2007 12:07:15 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
General Documents
Doc Date
4/22/1985
Doc Name
Proor of Publication for A Variety of Revisions (1981 to 1985)
From
POWDERHORN COAL CO
To
MLRD
Permit Index Doc Type
NEWSPAPER ARTICLES
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• NOTICE OF PROPOSED DECISION • <br />The Colorado Mined Land Reclamation Division has issued a proposed decision on <br />October 25, 1982, to approve a technical revision for mining and reclamation at the <br />Roadside Mine, Permit No. 77-442 (C-041-81), owned by Powderhorn Coal Company, <br />under the provisions of the Colorado Surface Coal Mining Reclamation Act of <br />1979. The proposed technical revision was submitted by Powderhorn Coal Company <br />P.O. Box 1430, Palisade, Colorado 81526 on October 6, 1982, for the Roadside <br />Mine. The affected area is located approximately 5 miles east of Palisade, <br />Colorado off Interstate,70. <br />The subject technical revision is a proposal to build a new access road to the <br />Cameo coal processing waste pile. The legal description for the affected area <br />is as follows: <br />0.73 Acres located in: <br />SE 1/4, SE 1/4, Section 28, T10S, R98W, 6th P.M. <br />Copies of the proposed technical revision are available at the Colorado Mined <br />Land Reclamation Division, 1313 Sherman Street, Room 423, Denver Colorado <br />80203. Any person who has an interest which is or may be adversely affected <br />may request a formal hearing regarding this proposed decision. Requests for <br />a formal hearing must be made in writing within ten (10) days of this pub- <br />lication and shall state with reasonable specificity the reasons for the <br />request and the objections to the proposed decision. <br />
The URL can be used to link to this page
Your browser does not support the video tag.