Laserfiche WebLink
<br /> <br />Exhibit B <br />' TRAFFIC PATTERNS FOR THE DISTEL FARM OPERATION, CAMAS AMERICA <br />' The existing R. I. A. is adequate in terms of improvements and maintenance. The proposed <br /> amendment will not impact the adjacent roads in number and types of vehicles anticipated beyond <br /> that anticipated for the two separate gravel operations permits, USR-877 and USR-1046, now <br />' held b}' the applicant. However, the applicant is hereby requesting a change in the agreement to <br /> allow traffic to move both east and west from the access point at WCR 20 1/2. At that point, <br />' S0% o:Fthe traffic would proceed each direction from the access. At WCR 7, one-half of the <br />traffic ~s+ill proceed each way, north and south. At WCR 1, one-half of the traffic will proceed <br /> each way, north and south. <br />' Some rnaterial is imported to the site for processing and mixing to make specification products. <br /> This material is generally backhauled to the site with the same trucks that haul from the site. This <br /> is not a. major part of the production operation and does not affect traffic patterns. <br />1 <br /> <br />..1 <br /> <br />1 <br /> <br /> <br /> <br />1 <br /> <br />1 <br />