Laserfiche WebLink
., ~ <br />ind~ ~ Assod~to:. inc. : ~ ~ :. . <br />.1 ~ .. • <br />- _ : ~~... ~~ sir a+-rn y-~:_ ::._= r <br />. .. <br />.: <br />..., <br />,1110d1CT t0 Mils Coal Co. -. _ <br />iiOCATfON South lautt County. Colo. 1@ORT 110.. 3 <br />~ 20 !tile Coal Co. .. -. ~ <br />~AIOIgC PfJIFOMtEa <br />Per the request of hike Astuto of 20 Bile Coal Co., ve visited the site to <br />perform density testa on the base course of the haul road one half mile vest <br />of the office trailer and the turning loop for the tipple north of County <br />Road 33B. <br />IIEMARKS <br />The haul road at the Foidel Creek Hine appeared to be in good shape from the <br />gate to [he East end of [he road. All of the tests in this area from Sta. 0 + 50 <br />to 2 + 90 met the required 95X compaction. The road surface shoved no signs of <br />pumping or rutting. <br />The turn around road at the tipple north of County Road 33B vas for the most part <br />in poor condition. The portion of the road from the grizzly vest to the conveyor <br />crossing appeared to be yell compacted and shoved no signs of rutting oz pumping. <br />From where the conveyor crosses to the end of the road, the base course vas very <br />vet and and poorly compacted. It appeared as if the top foot had been scarified, <br />bladed and left for the haul trucks to compact the material back into place. <br />This appears to be the case since the material in this portion of the road vas <br />very vet, and the material in the shoulders where the trucks hadn't driven vas <br />soft and appeared to be uncompacted for the [op foot. All of the density tests <br />in this section of the road failed to meet the required 95%. <br />PROJECT NO 84-725 <br />