My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL42877
DRMS
>
Back File Migration
>
General Documents
>
GENERAL42877
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:11:40 PM
Creation date
11/23/2007 12:02:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
General Documents
Doc Date
3/11/2002
Doc Name
EA Coal Methane Drainage Project -Panels 16-24
From
MWH for USDA Forest Service
To
DMG
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CaalMetbane Drainage Pmjed - Pane4 16-74 Wen E/k Mine • PaRe 2-S <br />2.3.1 Alternative 1 - No-Action Alternative <br />Analysis of the No-Action Alternative is required by the Council on $nvironmental Quality (CEQ) <br />Regulations (Title 40 CFR Part 1502.14(d)). In the No-Action Alternative, the proposed coal <br />methane drainage project would not be approved. The existing mine ventilation system and <br />underground horizontal degasification boreholes would vent approximately 7 million cubic feet of <br />methane per day. These venting mechanisms, along with the previously completed MDWs, would <br />allotiv production of appro.imately 3.5 million tons of coal from current active mining panels in 2002. <br />Production beyond 2002 would not be economically viable with methane venting limited to the <br />existing mine ventilation system and underground horizontal degasification boreholes. No new road <br />consuvction, road rehabilitation, drill pad construction, surface drilling, or vertical methane drainage <br />activities would occur in the project area. The network of roads that currently exist in the project area <br />under Alternative 1 is shown on Figure F4, Current and I-Iistoxic Roads - Alternatives 1, No-Action. <br />Surface disturbance and related impacts from the coal methane drainage project would not occur. <br />The Minnesota Creek Road, Dry Fork Road, and Horse Gulch Road would continue to exist in the <br />project area. The West Flatiron Road is currently being used for access to MDWs that were <br />constructed in 2001. This road would be decommissioned in 2002 or 2003 and reclaimed to become <br />an ATV trail. Existing motorized trails would continue to be open for public and administrative use. <br />2.3.2 Alternative 2 -Sylvester Gulch/Long Draw Saddle Long-Term Access <br />Alternative 2 is the Proposed Action, as described in Section 1.3. A classified road would be <br />constructed in the project area and used fox [he next 30 years (approximately 2030) for access to the <br />mining lease area. This route would begin at the MCC mine facilities azea, run south on private land <br />approximately 2.1 miles (the existing Lower Sylvester Gulch Mine Road) until it reaches the National <br />Forest boundary. At the boundary, a new road would be constructed south and east approximately <br />1.1 miles along Sylvestez Gulch to its intersection with the West Flatiron Road. The route would <br />follow the existing West Flatiron Road for 0.7 miles, then the existing Long Draw Road for 0.4 miles. <br />A new segment of road would be constructed connecting the Long Draw Road to the Dry Fotk <br />Road. This new segment would be called the Long Draw Saddle Road. Once the Sylvester Gulch <br />access route is established and stabilized, approximately 2 miles of the West Flatiron Road, (east of its <br />intersection) with the Sylvester Gulch Road, would be closed and reclaimed. <br />The existing Minnesota Creek/Dry Fork access would be utilized for initial project area access until <br />completion of the Sylvester Gulch access route, in the fall of 2002. The Minnesota Creek/Dry Fork <br />access route would continue to support project traf&c for the operation of MDWs along the Upper <br />Deep Creek Road until 2003, or early 2004. After the Upper Deep Creek road and drill pads are <br />obliterated in 2003 or 2004, this access route would no longer be used for project-related traffic. <br />The remainder of the proposed roads are temporary roads. These temporary roads would exist for <br />two to four years. The roads and drill pads would be built and then obliterated sequentially from <br />2002 to 2008 as shown in Tables T1A and T1B. The network of roads and trails that currently exist <br />or would be constructed in the project azea under Alternative 2 is shown on Figure F5, Existing and <br />Proposed Roads -Alternative 2. Because Alternative 2 would involve construction of roads and drill <br />pads in restricted areas, exceptions to the high geologic hazazd; steep slope; and wetland, floodplain, <br />and riparian lease stipulations would be required. <br />Under Alternative 2, approximately 2.1 miles of existing roads would be used to access the project <br />azea, 11.4 miles of existing road would be used within the project area, 8.6 miles of previously <br />constructed road or trail would be reconstructed and used as temporary roads, and 4.1 miles of new <br />temporary roads would be constructed. The maximum total length of existing, reconstructed, and <br />new roads in the project area under Alternative 2 would be approximately 24.1 miles. <br />EnuimnmentalArtatment <br />~~rer/uev, csotFwtny~~/,/wer urvr <br />elr/az~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.