My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL42877
DRMS
>
Back File Migration
>
General Documents
>
GENERAL42877
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:11:40 PM
Creation date
11/23/2007 12:02:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
General Documents
Doc Date
3/11/2002
Doc Name
EA Coal Methane Drainage Project -Panels 16-24
From
MWH for USDA Forest Service
To
DMG
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Caa/Me!/~ane Drainage Pmjeet- Paneb 7G-24 Wert E!k Marc • Page 1-7 <br />1.3.5 Drill and Complete MDWs and Drill and Log Exploration Drillholes <br />MDWs and exploration drillholes would be drilled from the drill pads constructed over each of the <br />progressive longwall mining panels. MCC would drill vertical or neaz-vertical MDWs wherever <br />feasible. Where this is not possible due to access or environmental constraints, it may be necessary to <br />drill one or more angled MDWs Erom a single drill pad to intercept the tazget locations above [he coal <br />seam. The locations of the proposed drill pads and MDWs are shown on Map Ml, Project Atea <br />Activities With Surface Stipulations. Completion of approximately 70 MDWs and up to 10 <br />exploration drilllaoles is proposed. Up to 18 MDWs and 4 exploration drillholes would be drilled <br />during each yeaz of the program. <br />MDWs and exploration drillholes would typically be drilled using truck-mounted drill rigs and <br />standard rotary (tricone roller bits) and downhole hammer drilling methods. Drilling circulation <br />media, used to lift drill cuttings from the dtillhole and stabilize the hole during drilling operations, <br />would normally include air, water; and biodegradable polymer foams. Gels, surfactants, and <br />bentonite-based drilling muds would also be used to stabilize the drillhole, if necessary. Other <br />materials, including crushed peanut shells, cottonseed hulls, and cedar Fibers could also be added to <br />the circulation medium to help seal the walls of the hole to maintain circulation. All drilling fluids <br />and additives that could be used are either naturally occurring inorganic or organic materials or <br />biodegradable compounds, <br />Water for drilling operations would be pumped to individual drill sites from portable tanks using high <br />pressure hose. Drilling water would be obtained from the mine dewatering system or other sources <br />for which MCC has applicable or can obtain water rights. All drilling fluids and cuttings would be <br />contained on the drill pad in mud pits or portable tanks. Earthen berms on the perimeter of the drill <br />pads, designed to intercept and contain mnoff from the pad azea, would also serve as secondary <br />containment to prevent the release of drilling fluids from the pad area. <br />MDWs would be completed and cased with cemented steel casing, as shown on Figure F3, Typical <br />Methane Drainage Well Construction/Completion. The casing prevents deterioration of the drillhole <br />and maintains an open flow path for methane drainage. Cementing the casing in the borehole <br />prevents flow of either gas or water in the annulus between the casing and borehole and prevents <br />contamination of ground water or mixing between ground water sources. Control valves would be <br />installed on the surface casing to control methane flow. Blow-out preventers aze not necessary on the <br />well heads since the project area is not a producing gas field, high pressure gas has. not been <br />encountered in any previous drilling in the azea, and the coal bed methane present is not pressurized <br />and is typically released very slowly under natural conditions. Exploration drillholes would be <br />completed, logged (to obtain information on geology and coal and overburden occurrence and <br />characteristics), and then plugged and sealed, completed as a MDW, of completed for monitoring or <br />other uses acceptable to both the USFS, MSHA, the CDMG, and MCC. <br />Following completion of drilling activities for [he MDWs and any exploration drillhole, the size of <br />each drill pad would be reduced by reclaiming all pad azeas except those areas required for MDW <br />operation and access. Generally, this would involve reduction in the pad size from 0.5 acres to <br />approximately 0.05 acres and reclamation of the remainder. One or more of the initial drill pads <br />within each of the three mining districts (Panels 14-175, Panels 18-20, and Panels 21-24) would be <br />used as a staging azea for temporary storage of equipment and supplies for subsequent pad <br />construction and drilling. For those pads used as staging azeas, pad reduction and interim reclamation <br />would be deferred until all drilling was completed in the corresponding ttilning district. <br />I vmnrv...,v.uor~roy, u.,mu wFr Environmental.9.rrerrment <br />i/s/oz.s <br />
The URL can be used to link to this page
Your browser does not support the video tag.