Laserfiche WebLink
kerr coal company <br />III IIIIIIIIIIIIIIII <br />one tabor center • suite 2500 <br />1200 seventee t •~lorado 80202 <br />~~ <br />®~~1~1985 <br />December 16, 1985 <br />Co o~0ep ~QDh '~~ Re~soATiaN <br />Mr. Steve Renner <br />Mined Land Reclamation Division <br />423 Centennial Building <br />1313 Sherman Street <br />Denver, Colorado 80203 <br />Dear Steve: <br />(303623-8317 <br />twx 910-931-2561 <br />Pursuant to the requirements of Mining and Reclamation Permit <br />No. C-006-80, I am enclosing with this letter our annual certifi- <br />cation of the stability of the overburden stockpile. The certifi- <br />cation inspection was performed by Eldon D. Strid of ACZ, Inc., <br />Steamboat Springs, Colorado, on November 23, 1985. As noted in <br />the above-referenced permit, when the factor of safety of the pile <br />is determined to be greater than 1.5, no further certification <br />will be required. <br />Please call if you have questions regarding this matter. <br />incerely, <br />v v~-_ <br />avi Gossett <br />Chief Mining Engineer <br />DRG/da <br />Enclosure <br />cc: J. T. Cooper - Energy Fuels (Denver) <br />G. V. Patterson - Energy Fuels (Walden) <br />Central Files <br />