Laserfiche WebLink
<br />~~ <br />ESTIMATING FORM - REVE GETATION NORK cont'd Filename M021-11 <br />B. SHRUB 8 TREE TRANSPLANTS <br />____________________________ I ~ MATERIAL:I PLANTING: I E/FERT <br />SPECIES NAME ~ OUAN./ACRE ~ STOCK TYPE 8 SIZE I E/PLANT ~ E/PLANT ~ PELLET <br />No transplants required <br />C. SEEDBED PREPARATION <br />_______________________ <br />_______________________ <br />Tilling method #1: <br />#2: <br />sheet 2 of 2 <br />TOTAL ~ TOTAL <br />S/PLANT ~ E/ACRE <br />ED.00 <br />-----==========-°_____~_____=========c=c==~==___________ <br />Total transplant cost/acre: EO.OD <br />D. SEED APPLICATION Total cost/acre: 50.00 <br />Seeding method: broadcast seeding ('93 contr. data) Total cost/acre: 5150.00 <br />E. FERTILIZING <br />_______________ FERTILIZER / SOIL AMENDMENT I UNITS/ACRE ~ UNIT ~ E/UNIT I E/ACRE <br />Materials used #1: superphosphate (0- 20-0 w/12% S) * ~ 25.00 ~ pound ~ 50.14 ~ 53.50 <br />#2: <br />#3: <br /> Total materials cost/acre: 53.50 <br />Application method #1: hand held t~roadcast spreader * 5101.63 <br />#2: <br />F. MULCHING <br />Total application cost/acre: 5101.63 <br /> MULCH / NETTING / OTHER MATERIALS <br />________ <br />________________ <br />_______ <br />_ <br />_______ ~ UNITS/ACRE UNIT ~ E/UNIT <br />=====__===============I========== <br />______ E/ACRE <br />====________: <br /> <br />Materials used #1: _ <br />_ <br />________ _ _______ _______ ________ _______ <br />_ <br />_ <br />hay (delivs~red) - ton * I <br />~ 1.50 ~ ton ~ 5106.65 ~ <br />5159.98 <br />#2: <br />#3: <br />#4: <br />____________ <br />__________~_________ <br />__ <br />___ <br />___________: <br /> ____=====ve=====______'____________________ ___ <br />~ <br />~ <br />~ <br />Total materials cost/acre: 5159.98 <br />AppLi cation method #1: power mulch er (hay spr. 1" deep) •* 560.11 <br />#2: crimping (with tractor) * 541.41 <br />#3: <br />G. JOB COST <br />Total application cost/acre: 5101.52 <br />T of aL area to be seeded: 1.30 acres. Total E/acre 5611 .00 Total Initial Job Cost= 5794.30 <br />Estimated failure rate: 25.OOX of area. Total E/acre* 5611 .00 Total Reseeding Costs = E198.58~ <br /> __ _________ <br />* Reseeding <br />cost items: A <br />D E F ______ ___ <br />GRAND <br />TOTAL JOB COST = <br />5992.88 <br />