My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL42831
DRMS
>
Back File Migration
>
General Documents
>
GENERAL42831
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:11:38 PM
Creation date
11/23/2007 12:00:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981053
IBM Index Class Name
General Documents
Doc Date
1/16/1990
Doc Name
Midterm Review Findings Document
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.`. CO)~ADO MINED LAND RECLAMATIO~IVISION <br />ESTIMATING FORM - HYDRAULIC EXCAVATOR WORK <br />""""""_""""""""""."""."."""~-""""."""w"""" <br />Task No. 4 Prep. By~ DTM Permit No. C-81-053 <br />Date 12/27/89 Filename: C053-4 Operation;Blue Flame <br />Permit Action Midterm Review <br />Task Description Backfill Lower Bench <br />HOURLY EQUIPMENT COST: <br />Labor Single, Double, or Triple <br />County: LA PLATA Zone 1 Shifts S <br />""""""""-"" """"""" """"""""" <br />Machine Descript. CAT 225B (track mounted) <br />Cost Breakdown: Utilization Equipment <br />""""`"""`"`""" adjustment: Filename: <br />Ownership cost/hr = $39.25 N/A 225B--EX <br />Operating & Overhaul Cost/Hr = $29.26 (100X) """"""""" <br />Operator cost/hr = $20.26 N/A Total Fleet <br />--------- Cost/Hr: <br />Total Eqpt. Unit Cost/Hr = $83.77 583.77 <br />MATERIAL QUANTITIES: <br />Beg. <br />Volume: 1508 CCY <br />Initial ""`""""""""" Swell Loose <br />Volume: 1,508.0 CCY Factor: 1.165 Volume: 1,756.8 LCS' <br />Source of quantity take-off: Division site msmts <br />Source of est. swell factor: at Handbook <br />HOURLY PRODUCTION: <br />Cycle Time - Basic cycle time vs job condition rating AVERAGE <br />"""""""""" - Selected time value within basic rating MINIMUM <br />Basic cycle time = 0.320 mir <br />Bueket Capacity """""""""""' <br />Rated Capacity: 1.250 LCY (nominal heaped) <br />Bucket Fill Factor: 0.975 Loose material - mixed moist aggregates (95-: <br />Adjusted Capacity: 1.219 LCY <br />Job Condition Correction Factors - Altitude Adj. = 1.000 <br />""""""""""""`"""`"" """"""""""" - Job Efficiency = 0.830 (lsl <br />Site Altitude = 7,500 ft. -------- <br />"""`"`"" Net Correction 0.830 <br />Unadjusted Hourly Unit Production 228.52 LCY/Hr <br />Adjusted Hourly Unit Production 189.67 LCY/Hr <br />Adjusted Hourly Fleet Production 189.67 LCY/Hr <br />JOB COST: <br />Fleet size 1 Unit(s) Total Job Time: 9.26 Hoy <br />Unit Cost $0.442 /LCY Total Job Cost: $775.90 <br />
The URL can be used to link to this page
Your browser does not support the video tag.