Laserfiche WebLink
<br />erosion, they aze stable and will require infrequent maintenance. <br />(4.05.4(2)(a)). <br />3. No approvals of a stream channel diversion with a lesser capacity than <br />the unmodified stream channel immediately above and below the <br />diversion are necessary. (4.05.4(2)(b)). <br />4. No permanent diversions aze proposed. (4.05.4(4)). <br />E. Sedimentation Ponds <br />1. No sediment ponds aze proposed to be located in a perennial stream. <br />(4.05.6(1)(b)). <br />2. No settlement factor has been approved for the sediment pond serving <br />the site. (4.05.6(8)(f)). <br />3. Submittal of pond reports will quarterly so no alternative approvals are <br />required in this section. (4.05.6(10)(c)) <br />4. No alternative design criteria and specifications have been requested <br />for sediment pond design and/or construction. (4.05.6(11)). <br />F. Acid-forming and Toxic-forming Spoil <br />No acid-forming or toxic-forming spoil have been identified on site. <br />(4.05.8(3)). <br />G. Impoundments <br />No impoundments other than the sediment pond are proposed. (4.05.9(12)). <br />H. Surface and Groundwater Monitoring <br />1. The applicant will conduct monitoring of groundwater in a manner <br />approved by the Division. The groundwater monitoring plan is as <br />follows: <br />Two water samples will be taken, one from the Nu Mine portal <br />dischazge and one from the O.C. underground workings. These <br />samples will be taken quarterly and will be analyzed for pH, <br />conductivity and T.D.S. If the sample exceeds a conductivity 1000 <br />O.C. Mine No.2 Findings <br />24 <br />May 15, 1992 <br />